SH/T 3904-2005 in English
SUPERSEDEDRegulation for acceptance of completed construction projects in petrochemical industry
- Issued on:2006-01-17
- Implemented on:2006-01-17
- File Format:PDF
- Delivery:Via email within 1~3 business days
$873.00
Scope
These regulations clarify the procedures for completion acceptance of petrochemical construction projects (hereinafter referred to as construction projects), the implementation of completion acceptance, and the requirements for acceptance documents. These regulations apply to the completion acceptance of construction projects such as new construction, renovation, expansion, and technical transformation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SH/T 3117-2013 in English
Calculation method of thermal medium consumption for petrochemical industry design
2013-10-17 -

SH/T 3557-2015 in English
Construction specification for large equipment transporting in petrochemical industry
2015-04-30 -

SH/T 3080-2013 in English
Design specification for structure of cross-flow mechanical ventilation cooling tower in petrochemical industry
2013-10-17 -

SH/T 3415-2005 in English
High frequency resistance welded helically finned tubes
2006-01-17 -

SH/T 3902-2014 in English
Abbreviations of piping engineering in petrochemical industry
2014-12-24 -

SH/T 3051-2014 in English
Terms of piping engineering in petrochemical industry
2014-12-24 -

SH/T 3043-2014 in English
Codes for surface color and mark on equipment pipe and steel structure in petrochemical industry
2014-12-24 -

SH/T 3052-2014 in English
Legend of piping engineering in petrochemical industry
2014-12-24