Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
petrochemical construction projects construction projects completion acceptance acceptance documents new construction vein acquisition technology early finger vein recognition devices vertical type watch packaging boxes
SH/T 3904-2005 in English

SH/T 3904-2005 in English

SUPERSEDED

Regulation for acceptance of completed construction projects in petrochemical industry

  • Issued on:2006-01-17
  • Implemented on:2006-01-17
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $900.00
$873.00
Standard No: SH/T 3904-2005
Document status: SUPERSEDED
Superseded by: SH/T 3904-2014 Regulation for acceptance of completed construction projects in petrochemical industry
Superseded on: 2015-06-01
Title in English: Regulation for acceptance of completed construction projects in petrochemical industry
Title in Chinese: 石油化工建设工程项目竣工验收规定
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2006-01-17
Implemented on: 2006-01-17
Chinese Classification: P72-Petrochemical and chemical industry engineering
Professional Classification: SH-Petrochemical
Related Keywords: petrochemical construction projects
construction projects
completion acceptance
acceptance documents
new construction
Related Topics: Petrochemical
project
Oil reserve depot engineering project construction
Graphitization degree project
construction project
project
Project Regulations
Project Regulations
Graphdiyne project
Petrochemical and Chemical
construction project
completed
a project by a
Graphdiyne project
Chemical Equipment Regulations
Hundred billion gold project engineering
Acceptance project system
Complete set of industrial automation projects
Item acceptance method
project department
sh t 0752 2005
Acceptance regulations
Chemical industry construction project test run
Gas engineering project
construction project
Construction project completion environmental protection acceptance management regulations
Completion acceptance
Andean Project PetroChina
SH/T 0770-2005
High-altitude working technology in petrochemical engineering
Petrochemical dcs design
Chemical cleaning construction and acceptance of petrochemical equipment and pipelines
Petroleum and Chemical Industry Engineering Construction Project Management
Communication engineering construction project acceptance
Construction quality acceptance of oil and gas engineering projects
Petrochemical construction engineering
Waste incineration treatment engineering design for chemical construction projects
Robot project acceptance
Specifications for acceptance of petrochemical instruments.
Petrochemical powder engineering design
Engineering design of mechanical pumps for petrochemical industry
sh/t 0774-2005
Biomass project engineering acceptance
Petrochemical Engineering International
sh/t 0780-2005
Completion acceptance of electrolytic aluminum project
sh/t 0597 2005


Scope

These regulations clarify the procedures for completion acceptance of petrochemical construction projects (hereinafter referred to as construction projects), the implementation of completion acceptance, and the requirements for acceptance documents. These regulations apply to the completion acceptance of construction projects such as new construction, renovation, expansion, and technical transformation.

Sample only — not a preview of SH/T 3904-2005
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend