SL 77-2013 in English
VALIDCode for hydrological calculation of small hydropower station
- Issued on:2013-12-23
- Implemented on:2014-03-23
- File Format:PDF
- Delivery:Via email within 1~3 business days
$553.00
Scope
This standard is applicable to hydrological calculations in all design stages and operation periods of small hydropower stations with an installed capacity of 50,000 kW and below, and can be used as a reference during the planning stage. Small hydropower stations with an installed capacity of less than 500kW can be appropriately simplified, see Appendix A.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 499-2010 in English
standard test method for determining residual stresses by the hole-drilling strain-gage method
2010-08-20 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08