SY/T 5810-2003 in English
SUPERSEDEDDesign and downhole operation of continuous gas lift
- Issued on:2003-03-18
- Implemented on:2003-08-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$250.00
$243.00
$243.00
本标准规定了气举采油井设计原则、气举井设计,气举阀词试,管柱结构、气举井工艺流程、施工准备,作业程序及安全质量控制。本标准适用于油田连续气举采油井的设计和施工作业。
Scope
This standard specifies the methods and requirements for continuous gas lift production well design, gas lift valve debugging, and construction operations. This standard applies to the design and construction operations of continuous gas lift production wells.
Sample only — not a preview of SY/T 5810-2003

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 6464-2016 in English
Technical specifications for horizontal well completion
2016-01-07 -

SY/T 5821-2012 in English
Water shutoff technology with organic plugging agent for carbonate reservoir
2012-01-04 -

SY/T 6449-2000 in English
Calibration of detecting tool and evaluating method for cementing quality
2000-03-10