SY/T 6644-2018 in English
VALIDTechnical specification for design and downhole operation of continuous flow gas lift installations using injection pressure operated valves
- Issued on:2018-10-29
- Implemented on:2019-03-01
- File Format:PDF
- Delivery:Via email within 5 business days
$864.00
Introduction
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 5962-1994 in English
Well washing machine
1994-12-01 -

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY/T 6418-1999 in English
Round thread casing joint strength with combined internal pressure and bending
1999-05-17 -

SY/T 5891.1-1999 in English
Specification of making concrete targets for well perforators test
1999-05-17 -

SY 4028-1993 in English
Standard for Quality Inspection and Evaluation of Petroleum Construction Engineering the Work for Plant Installation
1993-09-09 -

SY/T 5734-1995 in English
Test Specification for Examining Seal of Under-well Packer for Separate Mining and Separate Injection Well
1995-11-08 -

SY 0470-2000 in English
Standard for construction and acceptance of oil and gas pipeline overhead crossing project
2000-03-31 -

SY/T 5933-1994 in English
Seismic reflection layer layer name code
1994-08-04