Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
oil drilling rigs double-lift drilling rigs petroleum drilling rigs wellsite foundation requirements foundation form gas drilling cylindrical seat scopegb/t define zhoushan fisheries rotary copper refinery
SY/T 6586-2020 in English

SY/T 6586-2020 in English

VALID

Petroleum drilling and production equipment-Site installation and inspection for drilling rigs

  • Issued on:2020-10-23
  • Implemented on:2021-02-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $500.00
$485.00


Introduction

Analysis of the key points of standard update

Revision dimensions 2014 version 2020 version
Standard name On-site installation and inspection of oil drilling rigs On-site installation and inspection of oil and gas drilling and production equipment drilling rigs
Wellsite foundation requirements Foundation form is not detailed New clauses on special requirements for foundation bearing strength
Equipment classification 7 types of systems Expanded to 12 types of systems (newly added string automation, etc.)

Core installation technical requirements

1. Derrick installation specifications

During the lifting process of the self-elevating derrick, when the angle reaches 75°~80°, the speed must be reduced for buffering. After the derrick is in place, the deviation between the center of the crane and the center of the turntable should be ≤20mm. Key control points:

  • Stop and check at a trial lifting height of 100-200mm
  • Operation is prohibited when wind speed exceeds Level 5 (8.0m/s)
  • Double-lift drilling rigs require secondary alignment

2. Anti-collision system upgrade

The 2020 version clearly requires the configuration of two independent anti-collision systems, including:

Over-roll valve type: Braking is completed within 3 seconds after the lever is triggered
Digital anti-collision: High/low limit deceleration test is required


Typical equipment installation parameters

Equipment type Key indicators Allowance Deviation
Drive Sprocket Coplanarity ≤0.045 times pitch
Pulley V-groove Coplanarity ≤1/3 wheel width
Hydraulic Disc Brake Brake Disc Runout ≤0.3mm

Implementation Suggestions

  1. Foundation Pre-inspection: The base of the frozen soil area needs to be 250mm below the freezing line
  2. Digital Management: It is recommended to use an electronic inspection record system
  3. Staff Training: Focus on training on string automation system operation