T/CAPE 10104-2022 in English
VALIDManagement procedures for test instruments and equipment on the long-term performance and durability of concrete
- Issued on:2022-02-28
- Implemented on:-
- File Format:PDF
- Delivery:Via email within 10 business days
$1,019.00
本文件规定了混凝土长期性能和耐久性能试验仪器设备管理的总体要求、基本性能和设计、生产、使用、维护、检定/校准及报废的要求。
本文件适用于混凝土长期性能和耐久性能试验仪器设备(包括:混凝土抗冻仪、混凝土动弹性模量测定仪、混凝土抗水渗仪、混凝土抗氯离子渗透测定仪、混凝土收缩测定仪、混凝土碳化试验箱、全自动混凝土硫酸盐干湿循环试验箱、混凝土气体渗透测试仪、混凝土低温硫酸盐试验箱)的设计、生产、使用、维护、检定/校准和报废的管理。
混凝土拌合物性能试验仪器设备生产企业、检定/校准企业、从事相关检测的第三方检测机构、预拌混凝土生产企业实验室、PC构件工厂实验室及其他混凝土相关实验室可参照使用。
Scope
Preface Introduction
1 Scope
2 Normative References
3 Terms and Definitions
4 General Principles
4.1 Management System for Instrument Equipment
4.2 Equipment Management Regulations
4.3 Requirements for Reports on Instrument Equipment
4.4 Personnel Requirements for Instrument Equipment
4.5 Data Security of Instrument Equipment
4.6 Capability Verification of Instrument Equipment
4.7 Requirements for Calibration/Verification of Instrument Equipment
4.8 Scrapping of Instrument Equipment
5 Basic Performance
5.1 General Regulations
5.2 Performance of Freeze Resistance Test Apparatus
5.3 Performance of Concrete Dynamic Elastic Modulus Tester
5.4 Performance of Water Permeability Resistance Test Apparatus
5.5 Performance of Chloride Ion Penetration Tester for Concrete
5.6 Performance of Shrinkage Tester for Concrete
5.7 Performance of Carbonation Chamber for Concrete
5.8 Performance of Automated Concrete Sulfate Wet-Dry Cycling Test Chamber
5.9 Performance of Gas Permeability Tester for Concrete
5.10 Performance of Low-Temperature Sulfate Test Apparatus for Concrete
6 Production Requirements
6.1 General Regulations
6.2 Production Requirements for Freeze Resistance Test Apparatus
6.3 Production Requirements for Dynamic Elastic Modulus Tester
6.4 Production Requirements for Water Permeability Resistance Test Apparatus
6.5 Production of Chloride Ion Penetration Tester
6.6 Production of Shrinkage Tester
6.7 Production of Carbonation Chamber
6.8 Production of Wet-Dry Cycling Test Chamber
6.9 Production of Gas Permeability Tester
6.10 Production of Low-Temperature Sulfate Test Apparatus for Concrete
7 Use and Maintenance
7.1 General Regulations
7.2 Use and Maintenance of Freeze Resistance Test Apparatus
7.3 Use and Maintenance of Dynamic Elastic Modulus Tester
7.4 Use and Maintenance of Water Permeability Resistance Test Apparatus
7.5 Use and Maintenance of Chloride Ion Penetration Tester
7.6 Use and Maintenance of Shrinkage Tester
7.7 Use and Maintenance of Carbonation Chamber
7.8 Use and Maintenance of Wet-Dry Cycling Test Chamber
7.9 Use and Maintenance of Gas Permeability Tester
7.10 Use and Maintenance of Low-Temperature Sulfate Test Apparatus for Concrete
8 Calibration/Verification of Testing Equipment
8.1 General Regulations
8.2 Calibration of Freeze Resistance Test Apparatus
8.3 Calibration of Dynamic Elastic Modulus Tester
8.4 Calibration of Water Permeability Resistance Test Apparatus
8.5 Calibration of Chloride Ion Penetration Tester
8.6 Calibration of Shrinkage Tester
8.7 Calibration of Carbonation Chamber
8.8 Calibration of Wet-Dry Cycling Test Chamber
8.9 Calibration of Gas Permeability Tester
8.10 Calibration of Low-Temperature Sulfate Test Apparatus for Concrete
9 Auxiliary Materials and Substances
9.1 Freeze Resistance Test Apparatus
9.2 Chloride Ion Penetration Tester
9.3 Gas Permeability Tester
Appendix A (Informative) Lithium Hardness Method for Evaluating the Degree of Concretes Erosion

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

T/GZQC 001-2020 in English
High precision autoclaved aerated concrete blocks
2020-08-01 -

T/TMAC 025-2020 in English
Technical requirements for intelligently building digital twin workshops
2020-12-16 -

T/CECS 10109-2020 in English
Corrosion resistance precast concrete piles
2020-09-28 -

T/CECS 10303-2023 in English
Fiber reinforced concrete shield segment based on solid waste
2023-04-28