TZ 214-2005 in English
VALIDPassenger Dedicated Railway Tunnel Construction Technology Guide
- Issued on:2005-09-22
- Implemented on:2005-09-22
- File Format:PDF
- Delivery:Via email within 1~3 business days
$1,746.00
Scope
This technical guideline is applicable to the construction of railway tunnel projects for standard gauge passenger dedicated lines with a design speed of 200 to 350km/h for passenger trains. The construction of railway tunnel projects for ballastless track passenger dedicated lines should still comply with the relevant regulations for the construction of ballastless track passenger dedicated line railway projects.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

TZ 203-2008 in English
Technical Guide for Construction of Bridge and Culvert Engineering of Passenger and Freight Lines Railway
2008-10-20 -

TZ 209-2009 in English
Technical Guide for Construction of Railway Water Supply and Drainage
2009-04-13 -

TZ 205-2009 in English
Technical Guide for Construction of Railway Communication Engineering
2009-01-05 -

TZ 231-2007 in English
Drilling and Blasting Method for Railway Tunnel - Construction Procesure and Operation Guide
2007-03-04 -

TZ 321-2009 in English
Technical Guide for Construction of Concrete Beam Prefabrication Yard of Railway by Post-tensioning Method
2009-06-27 -

TZ 331-2009 in English
Construction Code for Waterproofing and Drainage of Railway Tunnel
2009-04-13 -

TZ 206-2007 in English
Technical Guide for Construction of Signalling Engineering of Passenger and Freight Lines Railway
2007-11-22 -

TZ 341-2007 in English
Technical Guide for Construction of railway GSM-R Digital Mobile Communication Engineering
2007-11-22