TZ 231-2007 in English
VALIDDrilling and Blasting Method for Railway Tunnel - Construction Procesure and Operation Guide
- Issued on:2007-03-04
- Implemented on:2007-03-04
- File Format:PDF
- Delivery:Via email within 1~3 business days
$175.00
| Standard No: | TZ 231-2007 |
| Document status: | VALID |
| Title in English: | Drilling and Blasting Method for Railway Tunnel - Construction Procesure and Operation Guide |
| Title in Chinese: | 铁路隧道钻爆法 施工工序及作业指南 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2007-03-04 |
| Implemented on: | 2007-03-04 |
| Related Keywords: | railway tunnel construction
blasting method railway tunnel railway tunnel projects construction procesure |
| Related Topics: | tz 10208
Working at heights iron drill manufacturing |
Introduction
*** Please note: This description may not be accurate, please refer to the official documentation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

TZ 321-2009 in English
Technical Guide for Construction of Concrete Beam Prefabrication Yard of Railway by Post-tensioning Method
2009-06-27 -

TZ 331-2009 in English
Construction Code for Waterproofing and Drainage of Railway Tunnel
2009-04-13 -

TZ 341-2007 in English
Technical Guide for Construction of railway GSM-R Digital Mobile Communication Engineering
2007-11-22 -

TZ 205-2009 in English
Technical Guide for Construction of Railway Communication Engineering
2009-01-05 -

TZ 206-2007 in English
Technical Guide for Construction of Signalling Engineering of Passenger and Freight Lines Railway
2007-11-22 -

TZ 203-2008 in English
Technical Guide for Construction of Bridge and Culvert Engineering of Passenger and Freight Lines Railway
2008-10-20 -

TZ 214-2005 in English
Passenger Dedicated Railway Tunnel Construction Technology Guide
2005-09-22 -

TZ 209-2009 in English
Technical Guide for Construction of Railway Water Supply and Drainage
2009-04-13