Purpose of the pilot
Purpose of the pilot, Total:53 items.
The international standard classification for "Purpose of the pilot" includes: Software development and system documentation , Natural gas .
The Chinese standard classification for "Purpose of the pilot" includes: Software engineering , Natural gas .
Group Standards of the People's Republic of China
- T/GDAQI 156-2024 Test method for high eyepiece eyepiece exit-pupil distance for slit lamp microscopy
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
- GB/Z 18914-2014 Information technology―Software engineering―Guidelines for the adoption of CASE tools
- GB/T 27895-2011 Natural gas - Determination of the hydrocarbon dew point - Cooled mirror method
Anhui Provincial Standard of the People's Republic of China
- DB3415/T 46-2022 Lu'an City Service Industry Standardization Pilot Construction Guide
Jiangxi Provincial Standard of the People's Republic of China
- DB36/T 1914-2023 Standardization pilot demonstration project effect evaluation specifications
American Water Works Association (AWWA)
- AWWA 51490 Pilot Testing With the End in Mind
- AWWA WSP57720 Pilot Water Restriction Program for the Osprey Area
- AWWA SOURCES66499 Water Efficient Landscape Rebate Pilot Program
- AWWA INF55792 Epoxy Lining of Cast Iron Pipe: Pilot Project
- AWWA ACE71080 Results and Findings from the Bay Area Regional Desalination Project Pilot Study
- AWWA 51742 The Cincinnati Water Works' Unidirectional Flushing Program: Pilot Program Results and Alternative Approaches for Full-Scale Implementation
- AWWA ACE65287 Successful Projects Today and Tomorrow: A Contractor's Perspective
- AWWA ACE58136 Impact of High Algae Feedwater on Conventional Treatment: San Luis Reservoir Low Point Improvement Project Pilot Study
- AWWA SOURCES66705 Residential Outdoor Water Use Pilot Program: Top 1%
- AWWA ACE92034 An Analysis of Seattle's Multifamily Retrofit Pilot Program
- AWWA ACE71067 Piloting a Course for Indirect Potable Reuse: The El Monte Valley Groundwater Recharge Project Pilot Studies
- AWWA ACE68649 Implementing a Pilot Desalination Project in the San Francisco Bay Region
- AWWA MTC64528 Desalination in San Francisco Bay: Results from the MMWD SWRO Pilot Program
- AWWA WQTC71549 Implementation and Optimization of Water Quality Event Detection Systems at the First Water Security Initiative Pilot
- AWWA ACE99528 The Cincinnati Water Works' Unidirectional Flushing Pilot Program: Impact on Water Quality and Customer Complaints
European Committee for Standardization (CEN)
- EN ISO 17637:2011 Non-destructive testing of welds - Visual testing of fusion-welded joints
British Standards Institution (BSI)
- BS EN ISO 17637:2011 Non-destructive testing of welds. Visual testing of fusion-welded joints
- BS HB 10197:2001 The Essentials of Project Management. 2nd edition
- BS EN 970:1997 Non-destructive examination of fusion welds - Visual examination
- BS ISO 22524:2020 Pilot plan for industrial wastewater treatment facilities in the objective of water reuse
- 19/30362917 DC BS ISO 22524. Pilot plan for industrial wastewater treatment facilities in the objective of reuse
Gosstandart of Russia
- GOST 24813-1981 Testing of items the point of view of influence on climatic factors. General
Korean Agency for Technology and Standards (KATS)
- KS B 0853-1995 VISUAL EXAMINATION OF SPOT WELDED JOINT
Spanish Association for Standardization (UNE)
- UNE 9-018-1985 Characteristics of coke required for boiler projects
- UNE 9-009-1985 Characteristics of gas fuel required for boiler projects
- UNE 9-008-1985 Characteristics of liquid fuels required in boiler projects
- UNE 9-007-1985 Characteristics of fossil solid fuels required for boiler projects
- UNE 9-017-1985 Characteristics of solid fuels from non-fossil sources required for boiler projects
Federal Aviation Administration (FAA)
- FAA 14 CFR PART 156-2011 State block grant pilot program
US-DOT
- DOT 23 CFR PART 773-2011 SURFACE TRANSPORTATION PROJECT DELIVERY PILOT PROGRAM
- DOT 23 CFR PT 773-2009 SURFACE TRANSPORTATION PROJECT DELIVERY PILOT PROGRAM
- DOT 23 CFR PT 773-2010 SURFACE TRANSPORTATION PROJECT DELIVERY PILOT PROGRAM
IX-EU/EC
- 89/455/EEC-1989 Council Decision Introducing Community Measures to Set up Pilot Projects for the Control of Rabies with a View to its Eradication or Prevention
US-FCR
- FCR COE R-93-1 FINAL REPORT-1993 PILOT STUDY EFFECTS OF IMPLEMENTING DAY USE FEES AT CORPS OF ENGINEERS PROJECTS
CZ-CSN
- CSN 73 0527 OPRAVA 1-1998 acoustics. Spatial acoustics in the field of design. Space cultural purpose. The school in the location. public purpose
- CSN 73 0527-1998 acoustics. Spatial acoustics in the field of design. Space cultural purpose. Location of School - Public Purpose
International Organization for Standardization (ISO)
- ISO 22524:2020 Pilot plan for industrial wastewater treatment facilities in the objective of water reuse
International Telecommunication Union (ITU)
- ITU-T J.21-1976 Performance characteristics of 15-kHz type sound-programme circuits
- ITU-T J.21-1984 Performance characteristics of 15 kHz type sound-programme circuits
- ITU-T J.21 FRENCH-1988 PERFORMANCE CHARACTERISTICS OF 15 kHz TYPE SOUND-PROGRAMME CIRCUITS
- ITU-T J.92 FRENCH-1997 Recommended Operating Guidelines for Point-to-Point Transmission of Television Programmes Study Group 9; 9 pp
- ITU-T J.92 SPANISH-1997 Recommended Operating Guidelines for Point-to-Point Transmission of Television Programmes Study Group 9; 9 pp
- ITU-R REPORT BT.1226-1990 Characteristics of a programme delivery control (PDC) system for video recording
National Association of Corrosion Engineers (NACE)
- NACE SP0188-1999 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates (Item No. 21038)
CH-SNV
- VSM 18710.3-1969 Node topics and principles
AIAG - Automotive Industry Action Group
- M-4-1997 Manufacturing Assembly Pilot (MAP) Project Final Report (Version 1)
Association Francaise de Normalisation
- Z44-059:1987 Documentation. Cataloguing. Choice of access points to bibliographic description : personal and corporate authorship and titles.
ITU-R - International Telecommunication Union/ITU Radiocommunication Sector
- RAPPORT BT.1226 FRENCH-1990 Caractéristiques d'un système de messagerie de programmes (PDC) pour l'enregistrement vidéo
Verification purpose,Aperture of test point,The purpose of the blink,The purpose of standard verification,Purpose of measurement,purpose of aging,The purpose of peaking,The purpose of version management,Purpose of Elemental Analysis,purpose of scientific research,purpose of testing,management purpose,Audit purpose,The purpose of this study,Purpose of the pilot,Pilot purpose,Positioned test points,The purpose of quantitative detection,Purpose of the pilot project,Pilot purpose