Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

How to Calculate Mobile Phase

How to Calculate Mobile Phase, Total:36 items.

The international standard classification for "How to Calculate Mobile Phase" includes: Power transmission and distribution lines .

The Chinese standard classification for "How to Calculate Mobile Phase" includes: .


General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB/T 15544.1-2023 Short-circuit current calculation in three-phase a.c. systems―Part 1:Calculation of currents
  • GB/T 15544.1-2013 Short-circuit Current Calculation in Three-phase a.c. Systems - Part 1: Calculation of Currents
  • GB/T 15544-1995 Short - Circuit current calculation in three - Phase a.c.systems

中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

  • GB/T 15544.5-2017 Short-circuit current calculation in three-phase a.c.systems―Part 5:Examples

GSO

Korean Agency for Technology and Standards (KATS)

SCC

  • AWWA CSC91008 Developing a Strategic Computerization Plan -- How and Why
  • AWWA JTMGT57458 How to Leverage a Computer Maintenance Management System to Increase Productivity
  • AWWA ACE68793 How a Comprehensive Communications Program on Backflow Prevention Can Keep Public Perception from Going Down the Drain
  • AWWA ACE61871 How Distribution Quality Can Drive Treatment Process Design: Saws First Treatment Plant
  • AWWA ACE60070 How Emerging Technologies Impact CII Conservation Progams
  • ASSP TR Z590.5-2019 Technical Report: How to Develop and Implement An Active Shooter/Armed Assailant Plan
  • AWWA DSS62064 How Well Does Automated Water Distribution Model Calibration Work?
  • DIN EN 60909-0 Supplement 4:2003 Short-circuit current calculation in three phase a.c. systems - Electrical equipment; Data for short-circuit current calculations
  • AWWA WQTC69485 How Design Translates into Real World Results
  • BS 7639:1993 Short-circuit current calculation in three-phase a.c. systems
  • BS PD 7639-1:1994 Short-circuit current calculation in three-phase a.c. systems-Factors for the calculation of short-circuit currents in three-phase a.c. systems according to BS 7639

ESDU - Engineering Sciences Data Unit

  • ESDU 94013-1994 NACA 1-series geometry representation for computational fluid dynamics.

US-CFR-file

  • CFR 20-702.243-2015 Employees'Benefits. Part702:Administration and procedure. SubpartB:Claims procedures. Section702.243:Settlement application; how submitted, how approved, how disapproved, criteria.

RU-GOST R

British Standards Institution (BSI)

  • PD 7639-1-1994 Short-circuit current calculation in three-phase a.c. systems. Factors for the calculation of short-circuit currents in three-phase a.c. systems according to BS 7639
  • BS EN 60909-0:2016 Short-circuit currents in three-phase a.c. systems. Calculation of currents

Standard Association of Australia (SAA)

SE-SIS

API - American Petroleum Institute

Danish Standards Foundation

International Electrotechnical Commission (IEC)

  • IEC 60909:1988 Short-circuit current calculation in three-phase a.c. systems

CZ-CSN

  • CSN 33 3022-1996 Short-circuit current calculation in three-phase a.c. systems