Subsequent selection
Subsequent selection, Total:55 items.
The international standard classification for "Subsequent selection" includes: Fiber optic interconnecting devices .
The Chinese standard classification for "Subsequent selection" includes: Optical communication equipment .
Hebei Provincial Standard of the People's Republic of China
- DB13/T 2659-2018 Technical Regulations for Selection of Holstein Reserve Bulls
Jilin Provincial Standard of the People's Republic of China
- DB22/T 3034-2019 Technical regulations for selection of feed efficiency for reserve breeding pigs
中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会
- GB/T 34081-2017 Wavelength selective switch
ACI - American Concrete Institute
- ACI SP-269 CD-2010 Concrete: The Sustainable Material Choice
AT-ON
- ONORM M 9733-1992 Criteria for selection of continuous handling equipment Criteres de selection pour engins de manutention continue
SCC
- AWWA WQTC71496 Sustainability in Water Treatment Process Selection
- AWWA ACE65141 Major Cities Choose Riverbank Filtration for Sustainable Supply
- AWWA SP250151 Membrane Selection
- AWWA ACE99398 Choosing DAF in the Process Selection for a Plant Expansion
- 12/30215639 DC BS 8539. Code of practice for the selection and installation of post-installed anchors in concrete and masonry
- NEMA ABP 1-2010 Selective Coordination
- MIL MIL-S-63175-1976 SWITCH, COMBINED OPTION SELECTOR: M167E1
ETSI - European Telecommunications Standards Institute
- EG 203 310-2016 CYBER; Post Quantum Computing Impact on ICT Systems; Recommendations on Business Continuity and Algorithm Selection (V1.0.0)
ES-UNE
- UNE 83704:2020 Concrete. Repair materials. Method of Repair Indexes (RIM) for the selection of the optimal repair technique and its follow-up after repair.
US-FCR
- FCR COE EP 690-2-1-1992 YOU, THE CORPS, AND THE FUTURE EMPLOYMENT OPTIONS UPON REORGANIZATION
U.S. Military Regulations and Norms
- ARMY MIL-S-63175 (1)-1990 SWITCH, COMBINED OPTION SELECTOR: M167E1
- ARMY MIL-S-63175 NOTICE 1-1995 SWITCH, COMBINED OPTION SELECTOR: M167E1
- ARMY MIL-S-63175-1976 SWITCH, COMBINED OPTION SELECTOR: M167E1
- ARMY MIL-V-5018 B-1985 VALVE, FUEL SELECTOR
API - American Petroleum Institute
- API SPEC 6FC-1989 SPECIFICATION FOR FIRE TEST FOR VALVES WITH SELECTIVE BACKSEATS FIRST EDITION
British Standards Institution (BSI)
- BS 8539:2012 Code of practice for the selection and installation of post-installed anchors in concrete and masonry
- BS EN ISO 27108:2013 Water quality. Determination of selected plant treatment agents and biocide products. Method using solid-phase microextraction (SPME) followed by gas chromatography-mass spectrometry (GC-MS)
- BS 8539:2012+A1:2021 Code of practice for the selection and installation of post-installed anchors in concrete and masonry
- 20/30420416 DC BS 8539 AMD1. Code of practice for the selection and installation of post-installed anchors in concrete and masonry
International Telecommunication Union (ITU)
- ITU-R M.257-3-1995 Sequential Single Frequency Selective-Calling System for Use in Maritime Mobile Service
- ITU-T Z.335-1988 ROUTING ADMINISTRATION
Korean Agency for Technology and Standards (KATS)
- KS H 2025-2021 Follow-up formulas
- KS M 9105-1996 Water quality-Determination of selected monovalent phenols(Gas-chromatographic method after enrichment by extraction)
- KS H 2522-2021 Follow-up formula
KR-KS
- KS H 2025-2022 Follow-up formulas
- KS H 2522-2022 Follow-up formula
VN-TCVN
- TCVN 7403-2014 Follow-up formula
Aeronautical Radio Inc.
- ARINC 628P5 ITEM 2.0 Parts Selection
- ARINC 644 ITEM 4.0-1993 Optional Capabilities
- ARINC 644A ITEM 5.0-1996 Optional Capabilities
European Committee for Standardization (CEN)
- EN ISO 27108:2013 Water quality - Determination of selected plant treatment agents and biocide products - Method using solid-phase microextraction (SPME) followed by gas chromatography-mass spectrometry (GC-MS) (ISO 27108:2010)
International Organization for Standardization (ISO)
- ISO 27108:2010 Water quality - Determination of selected plant treatment agents and biocide products - Method using solid-phase microextraction (SPME) followed by gas chromatography-mass spectrometry (GC-MS)
CZ-CSN
- CSN 34 7761 Cast.1-1988 Selector cord
Defense Logistics Agency
- DLA A-A-59853-2010 PICK, CHOCK
The Aluminum Association
- AASA-1998 Selection and Applications
- AA AASA-1998 Selection and Applications
US-CFR-file
- CFR 26-1.1291-9-2013 Internal revenue. Part1:Income taxes (continued). Section1.1291-9:Deemed dividend election.
CU-NC
- NC 57-93-1986 Refractory Selection
- NC 09-03-1968 Selection of metertela for dies
IETF - Internet Engineering Task Force
- RFC 3011-2000 The IPv4 Subnet Selection Option for DHCP
- RFC 7014-2013 Flow Selection Techniques
German Institute for Standardization
- DIN 7157 Bb.1:1973 Selection of fits; selection of tolerance zones according to ISO/R 1829
GOST
- GOST 30039-1993 Sigarettes. Sampling
CH-SNV
- SNV 29613-1949 Textiles — Tests for colour fastness Section E06: Colour fastness to Spotting: Alkali
IN-BIS
- IS 1249-1972 Grinding wheel selection suggestions
ESDU - Engineering Sciences Data Unit
- ESDU 94020-1994 Selection of synthetic oils.
Association Francaise de Normalisation
- NF EN 300064-3:2001 Telecommunications - Integrated Services Digital Network (ISDN) - Direct Inward Selection (DDI) Service Supplement - Digital Subscriber Signaling System No. 1 (DSS1) Protocol - Part 3: structure of subsequent ...
- NF EN 16279:2012 Animal feed - Determination of fluoride content, after treatment with hydrochloric acid, using the ion selective electrode (ISE) method
US-CFR
- CFR FED FCGS 02232.1-1985 SELECT-MATERIAL SUBBASE COURSE
CEPT - Conference Europeenne des Administrations des Postes et des Telecommunications
- CEPT T/CS 20-22-1983 Selection Directe D'Un Poste Supplementaire
select service,Solvent selection,follow-up analysis,Subsequent selection,Subsequent impact,next steps,follow-up assessment,follow-up assessment,Subsequent supervision,Subsequent supervision,follow-up project,Subsequent year,Subsequent quality,follow-up work,Follow up,follow-up formula,Subsequent processing,Follow-up,follow-up project,Fire follow-up