Construction and acceptance of equipment installation engineering
Construction and acceptance of equipment installation engineering, Total:37 items.
The international standard classification for "Construction and acceptance of equipment installation engineering" includes: Mining equipment , Equipment for the metallurgical industry , Ventilation and air-conditioning systems , Telecommunications in general , Lifting equipment , Postal services .
The Chinese standard classification for "Construction and acceptance of equipment installation engineering" includes: Architectural engineering construction machinery , Mechanical equipment installation engineering , Telecommunication equipment installation engineering , Electronic manufacturing industry engineering , Communication engineering , Telephone communication equipment , Microwave communication equipment , Post network system , Telecommunication power supply equipment .
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
- GB 50278-1998 Code for construction and acceptance of cranes installation engineering
- GB 50278-2010 Code for Construction and Acceptance of Crane Installation Engineering
- GB 50276-1998 Code for construction and acceptance of crusher and mill equipment installation engineering
- GB 50274-1998 Code for construction and acceptance of refrigeration and air seperating equipment installation engineering
- GB 50270-2010 Code for Construction and Acceptance of Conveyor Equipment Installation Engineering
- GB 50272-2009 Code for construction and acceptance of forging-press equipment installation engineering
- GB 51037-2014 Code for construction and acceptance of micro-assembling production line process equipment installation engineering
- GB 50231-1998 General Code for Construction and Acceptance of Mechanical Equipment
- GB 50467-2008 Code for construction and acceptance of micro-electronics manufacturing equipment installation engineering
- GB 50276-2010 Code for Construction and Acceptance of Crushing and Grinding Equipment Installation Engineering
- GB 50270-1998 Code for construction and acceptance of continuous conveyer equipment installation engineering
- GBJ 66-1984 Code for construction and acceptance of installation works of refrigeration equipment
- GB 50725-2011 Code for construction and acceptance of liquid crystal display manufacturing equipment installation engineering
- GB 50277-1998 Code for construction and acceptance of casting equipment installation engineering
- GB 50231-2009 General code for construction and acceptance of mechanical equipment installation engineering
- GB 50274-2010 Code for construction and acceptance of refrigeration and air seperating equipment installation engineering
- GB 50272-1998 Code for construction and acceptance of forging-press equipment installation engineering
- GB 50277-2010 Code for construction and acceptance of casting equipment installation engineering
- GB/T 50561-2010 Code for equipment installing and acceptance of building material industry
Professional Standard - Ferrous Metallurgy
- YBJ 217-1989 Specifications for construction and acceptance of metallurgical electrical equipment installation engineering
- YBJ 207-1985 Construction and acceptance specification for metallurgical machinery equipment installation - Hydraulic, pneumatic and lubrication system
Professional Standard - Post and Telecommunication
- YD 5017-1996 Technical Specification of Execution and Acceptance of Equipment Installation Engineering for Satellite Communication Earth Station
- YD 2012-1994 Technical specification of microwave relay communication equipment installation and acceptance
- YD 5014-1995 Specifications for digital muitipixer equipment instaiiation and acceptance
- YD 5011-1995 Specification for Constructruction and Acceptance of Teiegraph & Fax Equipment Installation Project
- YD 5009-1995 Temporary technical regulation for construction and acceptance of postal equipment installation project volume 2 power sorter
- YDJ 31-1983 Technical Specifications for Installation Engineering Construction and Acceptance of Communication Power Supply Equipment
- YDJ 41-1986 Technical Specifications for Installation Engineering Construction and Acceptance of Long-Distance Communication Telephone Exchange Equipment
- YDJ 37-1981 Technical Specifications for Installation Engineering Construction and Acceptance of Urban Local Telephone Exchange Equipment
Professional Standard - Forestry
- LY 5208-1993 Constructing and acceptance standard of woodbased panel machine in stalling engineering
- LY 5207-1993 Constructing and accepting standard of wood working machine installing engineering
Professional Standard - Urban Construction
- GB/T 50561-2019 Standard for equipment installing and acceptance of building material industry
Professional Standard - Building Materials
- JCJ 03-1990 Code for quality acceptance of cement mechanical equipment installation engineering
工业和信息化部
- JCJ/T 3-2017 Code for equipment installing and acceptance of cement mechanical equipment
Professional Standard - Light Industry
- QB/T 6003-2015 The equipment installation engineering construction of vacuum salt industry and the acceptance norms
农业农村部
- NY/T 2901-2016 Greenhouse engineering general code for construction and acceptance of mechanical equipment installation engineering
Professional Standard - Non-ferrous Metal
- YSJ 412-1992 Construction and acceptance specification for installation engineering of light-metal smelting machinery equipment
Construction and acceptance of industrial equipment pipeline anti-corrosion engineering,Mechanical equipment installation engineering construction and acceptance,Construction and acceptance of lifting equipment installation project,Construction and acceptance of forging equipment installation project,Fan, compressor, pump installation construction and acceptance,Construction quality acceptance of industrial equipment and pipeline insulation engineering,"Code for Construction and Acceptance of Boiler Installation Engineering",Construction and acceptance of mechanical equipment installation engineering,Construction and acceptance of crushing and grinding equipment installation project,Construction and acceptance of equipment installation engineering,Compressor, fan, pump installation construction and acceptance,Boiler installation engineering construction and acceptance,Installation engineering construction and acceptance,Construction and acceptance of electrical installations,On-site equipment, industrial pipeline welding construction and acceptance,Conveying equipment installation construction and acceptance,Construction and acceptance of industrial boiler installation project,Construction and acceptance of air separation equipment installation project,Construction and acceptance of metallurgical electrical equipment installation project,Construction and acceptance of installation engineering of electrical installations in power distribution system