Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
potentiometric type displacementmeter scopethis standard potentiometer displacement meters potentiometer-type displacement meters technical requirements water conservancy engineering buildings smoking commercial box-type cobalt-based alloy
DL/T 1135-2009 in English

DL/T 1135-2009 in English

ABOLISHED

Potentiometric type displacementmeter

  • Issued on:2009-07-01
  • Implemented on:2009-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $150.00
$146.00
Standard No: DL/T 1135-2009
Document status: ABOLISHED
Superseded on: 2024-11-24
Title in English: Potentiometric type displacementmeter
Title in Chinese: 电位器式位移计
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2009-07-01
Implemented on: 2009-12-01
ICS Classification: 27.140-Hydraulic energy engineering
Chinese Classification: P59-Water power engineering
Professional Classification: DL-Electricity
Related Keywords: potentiometric type displacementmeter scopethis standard
potentiometer displacement meters
potentiometer-type displacement meters
technical requirements
water conservancy engineering buildings
Related Topics: The potentiometer is divided into positive and negative
potentiometer
displacement
bx-21 phase meter
multiplet shift
Oxygen Potential
Panel Potentiometer
mobile mass spectrometer
Industrial potentiometer
Industrial potentiometer
automatic potentiometer
displacement device
Raman shift
Data potentiometer
membrane potential flow
potential and overpotential
Potentiometer
Series level gauge
peak shift
Statistical colocalization
Colocalization statistics
working potential relative potential
Electric displacement
Closed circuit potential Polarization potential
domain wall displacement
Potential action
shift peak
overpotential overpotential
oPeak shift
Everyone level gauge
Electromagnetic Phase Meter
phase shift mode
optical shift
Eleven Potentiometer
Displacement gauge
working potential
field potentiometer
shift eight
flow membrane potential
displacement standard
bipotential surface potential
potentiometer membrane potential
mean square displacement
phase shift mode
Capacitive level meter power supply ripple
Potentiometers and Voltmeters
jc1 membrane potential flow cytometry
XRD peak shift
Piezoelectric level gauge
Mud tapper positioning
Standard displacement
Displacement meter calibration
Constant oil level gauge execution
Mechanical positioner
Radiation Displacement Meter Test
gh/t 1135-1135

本标准规定了电位器式位移计的基本参数、技术要求、试验方法、检验规则、标志、包装、运输和储存等要求。
本标准适用于水电水利工程建筑物表面、内部变形(位移)监测的电位器式位移计。其他工程构筑物,可参照选用。


Scope

This standard specifies the basic parameters, technical requirements, test methods, inspection rules, marking, packaging, transportation, storage and other requirements for potentiometer displacement meters. This standard is applicable to potentiometer-type displacement meters for monitoring surface and internal deformation (displacement) of hydropower and water conservancy engineering buildings. Other engineering structures can be selected with reference.

Sample only — not a preview of DL/T 1135-2009
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend