Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
cycle gas turbine power plants gas turbine power plants semi-closed cycle gas turbine power plants gas turbines acceptance tests scopethis standard common elements backplane glass automation management system
GB/T 14100-2009 in English

GB/T 14100-2009 in English

SUPERSEDED

Gas turbines - Acceptance tests

  • Issued on:2009-04-13
  • Implemented on:2010-01-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $370.00
$359.00
Standard No: GB/T 14100-2009
Document status: SUPERSEDED
Superseded by: GB/T 14100-2016 Acceptance test of gas turbine
Superseded on: 2017-03-01
Title in English: Gas turbines - Acceptance tests
Title in Chinese: 燃气轮机 验收试验
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2009-04-13
Implemented on: 2010-01-01
Superseding: GB 10490-1989 Lightweight gas turbine acceptance test specification
GB/T 14100-1993 Gas turbines-Acceptance tests
ICS Classification: 27.040-Gas and steam turbines, Steam engines
Chinese Classification: K56-Gas turbine and its auxiliary equipment
Professional Classification: GB-National Standard
Related Keywords: cycle gas turbine power plants
gas turbine power plants
semi-closed cycle gas turbine power plants
gas turbines
acceptance tests scopethis standard
Related Topics: Pulley acceptance
Acceptance test
gas turbine
GB/T 14100-2016
Gas Turbine Acceptance Test
Nitrogen testing machine
Organic reagent acceptance
Acceptance of organic reagents
GB/T 14100
GB/t+14100
Acceptance test day
Gas Turbine Acceptance Test
GBT14100
GBT14100-1993
GB/T 14100-2009
GB/T 14100-2016
Hydrogen-doped gas turbine testing
Gas turbine emissions testing
Rack acceptance
Gas turbine test rig execution
Gas turbine thermal test standards
Heavy duty gas turbine fuel
Air flotation machine acceptance
Gas turbine reliability test
Gas turbine indicators
Gas pipeline acceptance
Gas turbine idle test
Gas turbine manufacturing acceptance
Combustible gas maintenance acceptance
Steam turbine quality acceptance test
Micro gas turbine system acceptance
gb14100

本标准规定了燃气轮机动力装置的验收试验方法,以确定或检验燃气轮机动力装置的功率、热效率等主要性能参数及其他性能。本标准适用于常规燃烧系统的开式循环燃气轮机动力装置,也适用于闭式循环和半闭式循环燃气轮机动力装置。经过适当的修改也可适用于其他热源的燃气轮机动力装置。正在研制中的燃气轮机可参照使用。


Scope

This standard specifies the acceptance test methods for gas turbine power plants to determine or inspect the main performance parameters such as power and thermal efficiency and other performances of gas turbine power plants. This standard applies to open cycle gas turbine power plants of conventional combustion systems, and also applies to closed cycle and semi-closed cycle gas turbine power plants. It can also be applied to gas turbine power plants with other heat sources after appropriate modification. Gas turbines under development can be used as a reference.

Sample only — not a preview of GB/T 14100-2009
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend