GB/T 18710-2002 in English
VALIDMethodology of wind energy resource assessment for wind farm
- Issued on:2002-04-02
- Implemented on:2002-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$262.00
《GB/T 18710-2002风电场风能资源评估方法》由TC20(全国能源基础与管理标准化技术委员会)归口,主管部门为国家标准化管理委员会。
本标准规定了评估风能资源应收集的气象数据、测风数据的处理及主要参数的计算方法、风功率密度的分级、评估风能资源的参考判据、风能资源评估报告的内容和格式。本标准适用于风电场风能资源评估。
Scope
This standard specifies the meteorological data to be collected for wind energy resource assessment, the processing of wind measurement data and the calculation method of main parameters, the classification of wind power density, the reference criteria for wind energy resource assessment, and the content and format of wind energy resource assessment report. This standard applies to wind energy resource assessment for wind farms.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 18451.1-2022 in English
Wind energy generation systems—Design requirements
2022-10-12 -

GB/T 44681-2024 in English
Wind energy generation systems—Technical specifications for post-evaluation and retrofitting of wind farms
2024-09-29 -

GB/Z 183-2026 in English
Wind energy generation systems—Requirements for marking and lighting of wind turbines
2026-07-30 -

GB/T 13981-2009 in English
Design general requirements for small wind turbine
2009-04-13 -

GB/T 47723-2026 in English
Wind energy generation systems—Automatic fire protection system for wind turbines
2026-05-25 -

GB/T 19963.1-2021 in English
Technical specification for connecting wind farm to power system—Part 1: On shore wind power
2021-08-20