《GB/T 19568-2017风力发电机组 装配和安装规范》由TC50(全国风力发电标准化技术委员会)归口,主管部门为中国机械工业联合会。
Introduction
In-depth interpretation of GB/T 19568—2017 Wind turbine assembly and installation specification
| Standard requirements | Specific provisions | Technical points |
|---|---|---|
| Bolt connection | Torque method and tension method, torque allowable deviation ±5% | Use anti-seizure lubricant and thread locking agent, tighten in three times. |
| Bearing assembly | Hot-fitting process, control the clearance change Δμ | The negative clearance requirements of tapered roller bearings and cylindrical roller bearings are ≤0.05mm and ≤0.1mm. |
| Hydraulic and lubrication systems | The bending radius of the hose is ≥9 times the outer diameter, and the length of the straight pipe section at the joint is ≥6 times the outer diameter | The oil filling amount and medium selection must meet the process requirements to ensure that no air is mixed. |
Implementation suggestions and actual cases
Requirements for key component assembly:
- Electromagnetic induction heaters shall be used for main shaft bearing assembly, and the temperature shall be controlled below 120℃.
- Check the gearbox elastic support for cracks and damage before assembly to ensure installation at the same height.
- Calculation formula for yaw and pitch drive normal backlash: j_bn = (0.03~0.05) × m
Installation inspection and quality assurance:
- The torque method is used to inspect the tightness of bolt connections, with a sampling rate of 10%. When the unqualified rate is 20%, 100% of the bolts shall be re-tightened.
- Electrical wiring requires good insulation of the wires, clear markings, and grounding resistance ≤4Ω.
Analysis of the background of standard formulation:
GB/T 19568-2017 replaces the old standard GB/T19568-2004. The main technical changes include:
- Expanding "screw and bolt connection" to "screw, bolt, stud connection".
- Adding assembly requirements for key components (yaw, pitch drive, brake, etc.).
- Supplementing the requirements for "wind rotor installation", "cable laying" and "electrical wiring" in wind farm installation.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 44681-2024 in English
Wind energy generation systems—Technical specifications for post-evaluation and retrofitting of wind farms
2024-09-29 -

GB/T 47557-2026 in English
Wind energy generation systems—Technical specification for braking system of wind turbines
2026-04-30 -

GB/Z 25425-2010 in English
Declaration of apparent sound power level and tonality values for the wind turbine
2010-11-10 -

GB/T 47723-2026 in English
Wind energy generation systems—Automatic fire protection system for wind turbines
2026-05-25 -

GB/Z 183-2026 in English
Wind energy generation systems—Requirements for marking and lighting of wind turbines
2026-07-30 -

GB/T 35792-2018 in English
Wind turbines—Conformity testing and certification
2018-02-06 -

GB/T 18451.1-2022 in English
Wind energy generation systems—Design requirements
2022-10-12 -

GB/T 31997-2015 in English
Codes of construction acceptance on wind power plant project
2015-09-11