Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
boundary determination power grid transmission energy conservation project electric power user power supply power factor definitions introductionthis standard fastener thread inspection system gb/t sg2
GB/T 32823-2016 in English

GB/T 32823-2016 in English

VALID

General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid

  • Issued on:2016-08-29
  • Implemented on:2017-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $150.00
$146.00

《GB/T 32823-2016电网节能项目节约电力电量测量和验证技术导则》由524(中国电力企业联合会)归口,主管部门为中国电力企业联合会。


Introduction

In-depth interpretation of the technical guidelines for measuring and verifying power saving in power grid energy-saving projects

Standard dimensions Scope of application Technical requirements Implementation methods
Project boundary determination Power grid transmission and distribution system and user power supply and distribution system Equipment replacement category: the boundary is the equipment body; installation or management category: the same voltage level, not exceeding the previous level substation bus. List the affected equipment, including geographical location, commissioning status and energy consumption parameters.
Setting the base period and reporting period Reflecting the typical operating conditions of the system Satisfying the maximum/minimum load conditions, it is recommended to set it to one year. Select representative dates, such as high load in summer and low load in winter.

Background of standard formulation and technical evolution

Background:With the expansion of power grid scale and adjustment of energy structure, the demand for energy conservation is becoming increasingly urgent. This standard aims to unify measurement methods and technical requirements to ensure data reliability.

Evolution:From GB/T28750-2012 to GB/T32823-2016, the requirements for power grid characteristic analysis and load fluctuation adaptability are supplemented.

Technical requirements for measurement and verification

  • Equipment selection:Online monitoring equipment is preferred, and parameters include voltage, current, power factor, etc.
  • Data collection:Electricity data should be collected at least once a day during the base period and the reporting period, and load data should be collected at least once an hour.

Uncertainty analysis and evaluation

Use Class A (reading fluctuation) and Class B (instrument accuracy) methods to evaluate standard uncertainty in accordance with JJ F1059.1-2012.

Implementation suggestions

  1. Preliminary preparation:Clearly define the project boundaries and time frame, and select appropriate measurement methods.
  2. Equipment calibration:Ensure that the test instrument meets the requirements of GB/T17167-2006.
  3. Data Analysis:Establish a base period loss model and calculate savings by comparing the reporting period data.
  4. Documentation:Write a detailed report, including uncertainty analysis and calibration value adjustment instructions.