Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
smart substation time synchronization system time synchronism system time synchronization system technical requirements performance indicators implementation suggestions system smart substation standard dimensions australian grape virus fittings introductionthis standard commercial franchising management
GB/T 33591-2017 in English

GB/T 33591-2017 in English

VALID

Technical specification of time synchronism system and equipment in smart substation

  • Issued on:2017-05-12
  • Implemented on:2017-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: GB/T 33591-2017
Document status: VALID
Title in English: Technical specification of time synchronism system and equipment in smart substation
Title in Chinese: 智能变电站时间同步系统及设备技术规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2017-05-12
Implemented on: 2017-12-01
ICS Classification: 29.020-Electrical engineering in general
Chinese Classification: F21-Electric power system
Professional Classification: GB-National Standard
Related Keywords: smart substation time synchronization system
time synchronism system
time synchronization system
technical requirements performance indicators implementation suggestions system
smart substation standard dimensions
Related Topics: Simultaneous capability
triple simultaneous system
substation
Smart substation
Equipment machine time
technology and time
GBT33591
GB/T 33591-2017
Substation equipment QR code technology
Intelligent substations at home and abroad
Foreign smart substations
Intelligent picking equipment technology
Device power-on time

《GB/T 33591-2017智能变电站时间同步系统及设备技术规范》由TC446(全国电网运行与控制标准化技术委员会)归口,主管部门为中国电力企业联合会。


Introduction

Standard framework of time synchronization system for smart substation

Standard dimensions Technical requirements Performance indicators Implementation suggestions
System architecture - Dual-master clock configuration method - Master-slave clock networking structure - Switching time is less than 1μs - Timekeeping performance is better than 1μs/h It is recommended to adopt dual-master clock redundant configuration to ensure system reliability.
Transmission medium
- Multimode optical fiber: Communication between master and slave clocks- Coaxial cable: Space-based timing signal transmission - Optical fiber transmission jitter time is less than 200ns - Serial port transmission accuracy is better than 1μs Select the appropriate medium according to the application scenario. Optical fiber is preferably used for long-distance transmission.
Timing signal - Pulse signal- IRIG-B code- Network time message (NTP/SNTP) - Serial port time message - Pulse signal: width 10ms~200ms - NTP accuracy is better than 10ms Select the appropriate timing method according to the equipment requirements. Network timing is suitable for station control layer equipment.

Standard Development Background and Technology Evolution Analysis

Case Study: Practical Application of Smart Substation Time Synchronization System

In actual power systems, the time synchronization system of smart substations needs to meet the requirements of high precision and high reliability. For example, under the jump control of ±1μs, ensure the accurate action of protection devices and measurement and control equipment to avoid misoperation caused by time deviation.

Implementation Suggestions

  • System Selection:Choose appropriate master-slave clock configuration according to the voltage level and scale of the substation to ensure redundancy and scalability.
  • Signal Transmission:Optical fiber media is preferred to reduce the impact of electromagnetic interference on time synchronization accuracy.
  • Equipment Selection:Select devices that comply with the DL/T 860 series standards to ensure compatibility with existing systems.
  • Maintenance management: Regularly check the antenna status, power supply and signal quality to avoid time deviation caused by environmental factors.

Sample only — not a preview of GB/T 33591-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend