GB/T 33601-2017 in English
VALIDPower grid equipment common model naming specification
- Issued on:2017-05-12
- Implemented on:2017-09-01
- File Format:PDF
- Delivery:Via email within 5 business days
$301.00
| Standard No: | GB/T 33601-2017 |
| Document status: | VALID |
| Title in English: | Power grid equipment common model naming specification |
| Title in Chinese: | 电网设备通用模型数据命名规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2017-05-12 |
| Implemented on: | 2017-09-01 |
| ICS Classification: | 29.020-Electrical engineering in general |
| Chinese Classification: | F21-Electric power system |
| Professional Classification: | GB-National Standard |
| Related Topics: | power grid
model data as33601 generic name pair Equipment English name GBT33601 GB/T 33601-2017 model data Device Naming Rules Electromechanical equipment data Equipment model data requirements Testing equipment naming National standard for data naming Circuit module naming convention Equipment Master Data Specification Template |
《GB/T 33601-2017电网设备通用模型数据命名规范》由TC446(全国电网运行与控制标准化技术委员会)归口,主管部门为中国电力企业联合会。
Introduction
Analysis of the core content of the standard
This standard constructs a naming system for power grid equipment covering all aspects of generation, transmission, transformation, distribution and use, and adopts a hierarchical path naming method to achieve unique identification of equipment. The main innovations include:
- Establish a four-level naming structure of "grid. power station. voltage level. equipment"
- Unify the mapping relationship between Chinese and English equipment naming
- Expand the naming rules of distribution equipment and secondary systems
Comparison of naming system architectures
| Naming hierarchy | Transmission network equipment | Distribution network equipment | Secondary equipment |
|---|---|---|---|
| First level | Regional power grid (such as North China) | Municipal power grid (such as Chengdu) | Main equipment/system |
| Second level | Name of plant and station (e.g. Fangshan Station) | Distribution line (e.g. Donggui Road) | Device type (e.g. transformer protection) |
| Third level | Voltage level (e.g. 500kV) | Tower/RMU number | Functional unit (e.g. differential protection) |
Key Technical Points
1. Full path naming rules
Use decimal point" and left slash"/" as separators to construct a naming structure containing 8 types of name items:
- Grid level: Supports five-level description of country-region-province-city-county
- Plant and station identification: Power plants need to be marked with the type suffix (plant/field/power station)
- Voltage level: DC equipment needs to be prefixed with "DC" (e.g. DC500kV)
- Equipment type: Follow the standard abbreviations in Table 2-Table 5
2. Special treatment of distribution network
Special rules are formulated according to the characteristics of distribution network equipment:
- Pole towers use the #n pole format (e.g.: #003-01 pole)
- Cable joints are marked with the start and end positions (e.g.: #05 cable intermediate joint_#06 cable intermediate joint cable segment)
- Ring main unit uses #n pole format (e.g.: #003-01 pole)
- >geographic name + type (such as: Dunyuanzhou #1 ring main unit)
Implementation and application suggestions
System transformation path
The existing system needs to establish a naming mapping table to achieve standard conversion. It is recommended to implement it in three stages:
| Stage | Goal | Key tasks |
|---|---|---|
| Transition period (6 months) | Dual-track operation | Develop naming conversion middleware and establish a mapping relationship between the old and new identifiers |
| Switchover period (3 months) | Gradual switchover | Migrate in batches according to voltage level, giving priority to equipment of 220kV and above |
| Consolidation period (ongoing) | Full compliance | Establish a naming review mechanism and include it in the acceptance link before equipment commissioning |
Typical problem handling
Common problems and solutions:
- Multiple lines on the same pole: Establish an association between physical poles and logical numbers
- Mixed-ownership equipment: Determine the grid to which it belongs according to the highest voltage level
- Historical naming conflicts: Adopt the "original number + standard suffix" transition plan
Technology evolution analysis
This standard has three major upgrades based on SD240-1987:
- Scalability: Add new power system elements such as renewable energy power stations and DC equipment
- Compatibility: Semantic alignment with DL/T 860 (IEC 61850) and CIM models
- Refinition: Refine the naming of distribution network equipment to the tower level to support distribution automation construction
Future concerns:
- Requirements for unique device identification in digital twin scenarios
- Lightweight naming scheme for IoT terminals
- Method of associating spatial coordinates with GIS systems

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 46131-2025 in English
Technical requirements and test methods for tap-changer for ultra high voltage transformers
2025-08-29 -

GB/T 40581-2021 in English
Calculation specification for power system security and stability
2021-10-11 -

GB/T 33591-2017 in English
Technical specification of time synchronism system and equipment in smart substation
2017-05-12 -

GB/T 35682-2017 in English
Specification for power grid operation and control data
2017-12-29