Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
general installation requirements special requirements + general provisions10-chapter system offshore installationundefinednewly aero-derivative gas turbines standard revision revision items2017 edition2025 edition structural frameworkchapter sheet-feeding machine open storage containers magnetic sputtering equipment scopethis standard
GB/T 33632-2025 in English

GB/T 33632-2025 in English

VALID

General installation requirements for aero-derivative gas turbines assembly

  • Issued on:2025-06-30
  • Implemented on:2026-01-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $315.00
$306.00
Standard No: GB/T 33632-2025
Document status: VALID
Title in English: General installation requirements for aero-derivative gas turbines assembly
Title in Chinese: 航空派生型燃气轮机成套设备安装通用技术要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2025-06-30
Implemented on: 2026-01-01
Superseding: GB/T 33632-2017 General installation requirements for aero-derivative gas turbine assembly
ICS Classification: 27.040-Gas and steam turbines, Steam engines
Chinese Classification: K56-Gas turbine and its auxiliary equipment
Professional Classification: GB-National Standard
Related Keywords: general installation requirements
special requirements
+ general provisions10-chapter system offshore installationundefinednewly
aero-derivative gas turbines
standard revision revision items2017 edition2025 edition structural frameworkchapter

《GB/T 33632-2025航空派生型燃气轮机成套设备安装通用技术要求》由TC259(全国燃气轮机标准化技术委员会)归口,主管部门为中国机械工业联合会。


Introduction

Core Changes of the Standard Revision

Revision Items2017 Edition2025 Edition
Structural FrameworkChapter 7 + General Provisions10-Chapter System
Offshore InstallationUndefinedNewly Added 5.2.6/7.5/9.8
Equipment FixingAnchor Bolt ChapterExpanded to 7 Chapters
Electrical systemGeneral requirementsAdded marine environment specifications

Analysis of key technical points

1. Foundation acceptance control

The allowable deviation of steel structure foundation is 3-4 times stricter than that of concrete foundation. Comparison of key indicators:

  • Coordinate position: ±5mm (steel structure) vs. ±20mm (concrete)
  • Elevation deviation: 0~-5mm vs. 0~-20mm
  • Recess size: 0~+5mm vs. 0~+20mm

2. New regulations for equipment alignment

The standard clarifies the requirements for controlling the impact of ambient temperature for the first time (6.4.1):

  1. Avoid measurement under direct sunlight
  2. 24-hour stability retest system
  3. Combined axial/radial runout measurement method

Implementation recommendations

Special requirements for offshore platforms

SystemAnti-corrosion measuresAcceptance criteria
Electrical equipment316 stainless steel labelGB50168-2018
Steel structureThree-proof treatmentSalt spray test ≥500h
Pipeline flangeSpecial grounding columnCross-sectional area ≥6mm²

Prevention of Typical Problems

  • Secondary Grouting: Non-expanding cement must be used, and the curing temperature should be >5°C
  • Lubricating Oil System: Raw tape is prohibited, and oil circulation cleaning is required (8.6.4)
  • Anchor Bolts: Q235 steel M56 bolts, tightening torque reaches 3000-3100 N·m

Sample only — not a preview of GB/T 33632-2025
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend