Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
overhead line maintenance original line → monitor shunt → equipment maintenance restoration phase anti-fall device cable line maintenance quick-plug terminal + technical guide ditsribution line introduction analysis ― information security management ― measurement scopein order reflective film adhesion performance testers digital cellular mobile communication network wireless operation
GB/T 34577-2017 in English

GB/T 34577-2017 in English

SUPERSEDED

Technical guide for by-pass working on ditsribution line

  • Issued on:2017-09-29
  • Implemented on:2018-04-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $490.00
$476.00

《GB/T 34577-2017配电线路旁路作业技术导则》由TC36(全国带电作业标准化技术委员会)归口,主管部门为中国电力企业联合会。


Introduction

Analysis of the core content of the standard

Technical elements 10kV requirements 20kV requirements Common indicators
Power frequency withstand voltage 45kV/1min 55kV/1min Insulation resistance ≥500MΩ
Lightning impulse ±75kV ±125kV Partial discharge ≤10pC
Current carrying capacity 35mm²:150A
50mm²:200A
Temperature rise ≤55K

Technical specifications for key equipment

Bypass flexible cable

It adopts a multi-strand soft copper wire conductor structure, with a cross-sectional area of ≥35mm², an insulation layer made of EPDM and other materials (thickness ≥5mm), a shielding layer of galvanized copper wire (≥10mm²), and an outer sheath of weather-resistant rubber (≥2mm). The mechanical performance requires a bending radius of ≤8 times the outer diameter, and the performance is maintained after 1000 bending tests.

Bypass load switch

It must have a phase-checking function, and SF6 insulation is recommended. The mechanical life is ≥3000 times and the breaking time is <20ms. The 10kV level must meet 45kV power frequency withstand voltage, 200A rated current, and 40kA short-circuit closing capacity.


Typical operation process

  1. Load transfer phase: Lay bypass cable → Install load switch → Live connection → Phase confirmation
  2. Maintenance implementation phase: Disconnect original line → Monitor shunt → Equipment maintenance
  3. Restoration phase: Restore connection → Secondary phase verification → Remove bypass system

Key points of safety control

  • Weather restrictions: Live work is prohibited when wind speed is >10m/s (level 5) or humidity is >80%
  • Personnel qualifications: The person in charge of the work must have more than 3 years of experience in power distribution maintenance and hold a certificate
  • Equipment inspection: 500MΩ insulation resistance test must be carried out before use
  • Prevent misoperation: Strictly implement the work ticket and supervision system

Technical innovation

This standard systematically regulates for the first time:

  • Quick-plug connector technology (mechanical life ≥ 1000 times)
  • Parallel operation conditions of mobile box transformers (ratio difference ≤ 5%)
  • Overhead laying mechanized operation process (maximum traction length 200m)

Implementation suggestions

Operation type Recommended equipment Risk prevention and control
Overhead line maintenance Insulating bracket + bypass load switch Insulation anti-fall device
Cable line maintenance Quick-plug terminal + ring network cabinet adapter Connector silicone grease protection
Transformer maintenance Mobile box transformer + parallel operation monitoring Strict phase verification process

Sample only — not a preview of GB/T 34577-2017
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend