Introduction
In-depth interpretation of GB/T 37898—2019 Technical regulations for the safe installation of wind turbines
Background and significance of standard formulation
With the rapid development of the wind power industry, the installation scale of wind turbines has continued to expand. As a key link in the installation, the safety and technical requirements of hoisting operations have been increasingly improved. GB/T 37898—2019 Technical regulations for the safe installation of wind turbines came into being, aiming to standardize the safe operation process of hoisting operations, reduce construction risks, and ensure the safety of personnel and equipment.
Standard Framework Comparison Table
| Chapter Number | Content Overview | Main Clauses | New/Revised Highlights |
|---|---|---|---|
| 1 | Scope | Specifies the scope of application and basic requirements of the standard. | Adds a new definition of large equipment hoisting, and clarifies hoisting operations of 80 tons and above or above 60 meters in height. |
| 3 | Terms and Definitions | Clarifies core concepts such as wind turbine hoisting and safety technical regulations. | Adds new definitions of "visibility" and "host components", and refines relevant technical requirements. |
| 4 | Personnel requirements | Comprehensively regulate from general requirements to special requirements (such as offshore operations). | Emphasis on certification, safety officer deployment and occupational health protection measures. |
| 5 | Equipment requirements | Covering technical specifications for lifting machinery, hanging baskets, tools/apparatus, etc. | Added standards for the use of synthetic fiber lifting belts and hand hoists. |
| 7 | Operation requirements | Comprehensively regulate from pre-lifting preparation to post-lifting operations. | Added lifting restrictions under adverse weather conditions and safety requirements for night operations. |
Implementation suggestions and technical points
1. Technical preparation stage
Preparation of lifting plan: Ensure that the plan has been reviewed by experts and covers emergency plans and schedules. Focus on checking the load rate of lifting machinery to ensure that it does not exceed 90%, and conduct trial lifting verification.
2. Equipment selection and maintenance
Lifting machinery: Select equipment that meets the lifting capacity and operating radius requirements of wind turbines. Regularly inspect the safety performance of lifting machinery to ensure that it meets the TSGQ7015 standard.
3. Personnel management
Certification: All operators must hold valid certificates and receive regular safety training. Offshore operators must also master life-saving skills and fire emergency knowledge.
4. Environmental and meteorological conditions
Response to severe weather: When the wind force exceeds level 6 (onshore) or level 7 (offshore), lifting operations are prohibited. For nighttime operations, sufficient lighting and visibility must be ensured.
Analysis of standard technology evolution
From historical versions to the latest revisions, GB/T 37898—2019 reflects the industry's continued attention to lifting safety and technological progress. The new content mainly focuses on equipment selection, personnel qualifications and operating requirements under severe conditions, reflecting the trend of wind power generation technology towards large capacity and high efficiency.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 2900.53-2001 in English
Electrotechnical terminology--Wind turbine generator systems
2001-09-01 -

GB/T 44681-2024 in English
Wind energy generation systems—Technical specifications for post-evaluation and retrofitting of wind farms
2024-09-29 -

GB/Z 183-2026 in English
Wind energy generation systems—Requirements for marking and lighting of wind turbines
2026-07-30 -

GB/T 40082-2021 in English
Wind turbines—Drive train ground test specification
2021-04-30 -

GB/Z 25425-2010 in English
Declaration of apparent sound power level and tonality values for the wind turbine
2010-11-10 -

GB/T 18451.1-2022 in English
Wind energy generation systems—Design requirements
2022-10-12 -

GB/T 47723-2026 in English
Wind energy generation systems—Automatic fire protection system for wind turbines
2026-05-25 -

GB/T 35792-2018 in English
Wind turbines—Conformity testing and certification
2018-02-06 -

GB/T 19963.1-2021 in English
Technical specification for connecting wind farm to power system—Part 1: On shore wind power
2021-08-20