Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
control project design project classification soil layer ≥1/3 pile length innovative design design parameters dynamic design landslide prevention cemented carbide helical morse taper hydraulic compression environmental risk assessment requirements implementation suggestions preferably
GB/T 38509-2020 in English

GB/T 38509-2020 in English

VALID

Code for the design of landslide stabilization

  • Issued on:2020-03-06
  • Implemented on:2020-10-01
  • File Format:PDF
  • Delivery:Via email within 10 business days
Price(USD): $970.00
$941.00

《GB/T 38509-2020滑坡防治设计规范》由TC93(全国自然资源与国土空间规划标准化技术委员会)归口,主管部门为自然资源部(国土)。


Introduction

Key points of landslide prevention and control project design


Project classification and load standards

Based on the threatened objects and economic losses, the prevention and control projects are divided into four levels:

GradeNumber of people threatenedTypical facilities
Special grade>500Nuclear facilities, buildings over 30 floors
Grade I100-500Railway trunk lines, oil and gas pipelines
Grade II<100Secondary highways, medium-sized water conservancy projects
Grade III-Village roads, small power projects

Note: The earthquake load is taken as 10% of the exceedance probability in 50 years. Special demonstration is required for special projects.

Key technologies of anti-slide piles

  • Rectangular anti-slide pilesMinimum side width ≥1.25m, pile spacing 5-10m
  • Circular anti-slide pilesDiameter ≥0.6m, reinforcement ratio ≥0.2%
  • The length of the embedded section must meet the following requirements: Rock layer ≥1/4 pile length, soil layer ≥1/3 pile length

Innovative design of anchor cable engineering

Case study of the Three Gorges Reservoir area: Using pressure-dispersed anchor cables, the designed anchoring force is 1500kN, the anchoring section length is 8m, and the bonding strength is increased by 40% through secondary splitting grouting

Dynamic design and information-based construction


A monitoring data feedback mechanism is used to adjust design parameters in real time based on geological anomalies revealed during construction, ensuring that the project safety factor is always ≥1.25.

Comparison of Typical Engineering Measures

Measure TypeApplicable ConditionsCost IndexConstruction Period (Month)
Anti-slide PilesMedium and Thick Layer Landslide1.03-6
Lattice AnchorageShallow Rock Landslide0.72-4
Square Cutting to Reduce LoadSteep Landslide at the Rear Edge0.51-3

Sample only — not a preview of GB/T 38509-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend