GB/T 38514-2020 in English
VALIDTest methods for electrodeionization stacks
- Issued on:2020-03-06
- Implemented on:2021-02-01
- File Format:PDF
- Delivery:Within 1 day
$125.00
《GB/T 38514-2020电去离子膜堆测试方法》由TC382(全国分离膜标准化技术委员会)归口,主管部门为国家标准化管理委员会。
Introduction
Evolution of Technical Standards for Electrodeionization Membrane Stacks
As an upgraded standard of HY/T120-2008, GB/T 38514-2020 systematically standardizes the test system of electrodeionization membrane stacks for the first time, forming a technical connection with the terminology definition of GB/T20103-2006. The background of standard formulation stems from the urgent need of the electronic-grade water preparation industry for quantitative evaluation of membrane stack performance.
Analysis of core test items
| Test dimensions | GB/T 38514-2020 requirements | Differences in traditional methods |
|---|---|---|
| Production water purity | Resistivity ≥15MΩ·cm (online monitoring) | Laboratory sampling and testing |
| Organic pollution | TOC≤50μg/L (GB/T11446.8) | Unspecified limit |
| Energy consumption control | kW·h/m³ calculation formula standardization | No unified algorithm |
Key test equipment requirements
The standard stipulates that the test equipment must be equipped with a 1.0-level precision flow meter and a 2.0-level resistivity meter, and the pipeline materials must comply with the GB/T17219 sanitation standard. Typical configurations such as precision filters (1μm) can effectively protect the membrane stack from particulate contamination.
Key points of operating specifications
- Start-up sequence: open the outlet valve first → start the booster pump → slowly adjust the inlet valve
- Stability determination: the resistivity of the produced water must be stable for more than 1 hour before recording data
- Safety specifications: The ground impedance test must comply with the requirements of Chapter 18 of GB9706.1-2007
Implementation suggestions
It is recommended that enterprises establish a three-level quality control system:
- Raw material stage: verify the conductivity of the ion exchange membrane (refer to Appendix A indicators)
- Production process: use this standard for modular testing
- Finished product inspection: add 72 hours of continuous operation test

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB 11562-2014 in English
Motor vehicles forward visibility for drivers—Requirements and measurement methods
2014-12-31 -

GB/T 35059-2018 in English
Determination on reabsorbed water of upgraded coal
2018-05-14 -

GB/T 13539.5-2020 in English
Low-voltage fuses—Part 5: Guidance for the application of low-voltage fuses
2020-11-19 -

GB/T 39356-2020 in English
Determination of total nickel,total cobalt,total selenium,total vanadium,total stibium,total thallium in fertilizers—Inductively coupled plasma optical emission spectroscopy
2020-11-19 -

GB 50168-2018 in English
Standard for construction and acceptance of cable line electric equipment installation engineering
2018-11-08 -

GB/T 37770.1-2022 in English
Refrigerated light hydrocarbon fluids—General requirements for automatic tank gauges—Part 1: Automatic tank gauges for liquefied natural gas marine floating storage
2022-10-12 -

GB/T 30117.1-2024 in English
Photobiological safety of non-coherent light products—Part 1: General requirements
2024-04-25 -

GB/T 18828-2022 in English
Horology—Divers' watches
2022-11-08 -

GB/T 4789.13-2012 in English
National food safety standard - Microbiological examination of food hygiene - Examination of Clostridium perfringens
2012-05-17 -

GB 50019-2015 in English
Code for Design of Heating Ventilation and Air Conditioning in Industrial Buildings
2015-05-11