GB/T 39698-2020 in English
VALIDConfirmation methods for delivering common Portland cement
- Issued on:2020-12-14
- Implemented on:2021-11-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$117.00
《GB/T 39698-2020通用硅酸盐水泥出厂确认方法》由TC184(全国水泥标准化技术委员会)归口,主管部门为中国建筑材料联合会。
Introduction
Interpretation of the core content of the standard
This standard specifies the full-process technical requirements for quality confirmation of general purpose Portland cement before leaving the factory, with the focus on:
- Construction of production process quality control system
- Prediction method of cement quality leaving the factory
- Grading and handling mechanism for quality anomalies
Comparison of key technical indicators
| Project | Strength grade 32.5 | Strength grade 42.5 | Strength grade 52.5+ |
|---|---|---|---|
| 28d compressive strength coefficient of variation Cv | ≤5.0% | ≤4.0% | ≤3.5% |
| Lower limit of quality assurance coefficient | Calculated according to the formula AM-X+1≥0 | ||
Key points for standard implementation
Typical application scenarios
After a cement group implemented this standard:
- Established a three-level traceability system for raw materials-clinker-cement
- Using JC/T 738 rapid inspection method to shorten the strength prediction cycle by 40%
- Dynamically adjust process parameters through quality assurance coefficient
Standard evolution analysis
Compared with previous specifications, the innovation of this standard is:
- For the first time, the quantitative calculation method of the quality assurance coefficient was clarified
- Heavy metal control requirements were increased during the coordinated disposal of solid waste
- The three-level response mechanism for quality anomalies was refined
Suggestions for enterprise implementation
- Data system construction: It is recommended to configure online detection equipment to realize real-time collection of process data
- Staff training: Focus on training on coefficient of variation calculation and strength prediction model application
- Document management: A separate "Factory Cement Confirmation Operation Instructions" needs to be compiled

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 35170-2024 in English
Combustible material preprocessed from CMSW for co-processing in cement kiln
2024-07-24 -

GB/T 37249-2018 in English
Calculation method of sulphur dioxide emission with portland cement clinker production
2018-12-28 -

GB/T 47190-2026 in English
Method for determining air content of cement mortar—Pressure method
2026-02-27 -

GB/T 4131-2014 in English
Nomenclature and terminology of cement
2014-06-24 -

GB/T 39701-2020 in English
Limit and test method of ammonium ion content in fly ash
2020-12-14 -

GB/T 31545-2015 in English
Portland cement for nuclear power engineering
2015-05-15 -

GB/T 18046-2017 in English
Ground granulated blast furnace slag used for cement,mortar and concrete
2017-12-29 -

GB/T 1596-2017 in English
Fly ash used for cement and concrete
2017-07-12 -

GB/T 45778-2025 in English
Test method for determining chemical shrinkage of cement paste
2025-06-30 -

GB/T 12573-2008 in English
Sampling method for cement
2008-06-30