Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
gas pipeline control system electrical protection application requirement i/o interface application interface system data element attributes mercury content introductionthis standard photovoltaic module export products scope本文件适用于光伏组件出口产品的低碳评价。
GB/T 46890-2025 in English

GB/T 46890-2025 in English

VALID

Oil and gas pipeline control system—Electrical protection application requirement for I/O interface

  • Issued on:2025-12-31
  • Implemented on:2026-07-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $270.00
$262.00
Standard No: GB/T 46890-2025
Document status: VALID
Title in English: Oil and gas pipeline control system—Electrical protection application requirement for I/O interface
Title in Chinese: 油气管道控制系统 I/O接口电气防护应用要求
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2025-12-31
Implemented on: 2026-07-01
ICS Classification: 25.040-Industrial automation systems
Chinese Classification: N10-Industrial automation and control device in general
Professional Classification: GB-National Standard
Related Keywords: gas pipeline control system electrical protection application requirement
i/o interface
application
interface
system

《GB/T 46890-2025油气管道控制系统 I/O接口电气防护应用要求》由TC124(全国工业过程测量控制和自动化标准化技术委员会)归口,主管部门为中国机械工业联合会。


Sample only — not a preview of GB/T 46890-2025
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • GB/T 32235.2-2024 in English

    GB/T 32235.2-2024 in English

    Industrial process measurement, control and automation—Digital factory framework—Part 2: Model elements

    2024-08-23
  • GB/Z 34066-2017 in English

    GB/Z 34066-2017 in English

    Control and communication network CIP Safety specification

    2017-07-31
  • GB/T 42445-2023 in English

    GB/T 42445-2023 in English

    Systems and software engineering—Functional size measurement—COSMIC method

    2023-03-17
  • GB/T 25740.1-2013 in English

    GB/T 25740.1-2013 in English

    PROFIBUS & PROFINET Technical Profile Profidrive - Part 1: Profile Specifications

    2013-12-31
  • GB/T 44988-2024 in English

    GB/T 44988-2024 in English

    On-line monitoring requirements for process industry safety instrumented systems

    2024-11-28
  • GB/T 47014.3-2026 in English

    GB/T 47014.3-2026 in English

    Industrial communication networks—Fieldbus specifications—Type 2 elements: EtherNet/IP,ControlNet and DeviceNet specifications—Part 3: Applicatoin layer service definition

    2026-01-28
  • GB/T 43436-2023 in English

    GB/T 43436-2023 in English

    Smart factory—Automation system for flexible manufacturing—General requirement

    2023-11-27
  • GB/Z 21099.6-2018 in English

    GB/Z 21099.6-2018 in English

    Function blocks(FB) for process control and electronic device description language(EDDL)—Part 6:Meeting the requirements for integrating fieldbus devices in engineering tools for field devices

    2018-06-07
  • GB/T 46933.3-2025 in English

    GB/T 46933.3-2025 in English

    Safety and security integration of smart factory—Part 3:System collaborative design requirements

    2025-12-31