GB/T 50756-2012 in English
VALIDTechnical Code for Ground Treatment of Steel Tanks
- Issued on:-
- Implemented on:-
- File Format:PDF
- Delivery:Via email within 1~3 business days
$388.00
| Standard No: | GB/T 50756-2012 |
| Document status: | VALID |
| Title in English: | Technical Code for Ground Treatment of Steel Tanks |
| Title in Chinese: | 钢制储罐地基处理技术规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Professional Classification: | GB-National Standard |
| Related Keywords: | general requirement
ground treatment ground treatment method sand-gravel column a ground treatment method cement-flyash-gravel pile a ground treatment method |
| Related Topics: | storage tank
reserve The usefulness of the tank Ground Treatment Technology Steel storage tank foundation design Foundation treatment GBT50756 foundation Technical specifications for foundation treatment jgj792012 Technical indicators of concentrated sulfuric acid storage tanks Acceptance of steel storage tank foundation foundation Steel tank foundation treatment technology Tank inspection technology gb50756 |
1 General Provisions
1.0.1 This code is formulated with a view to subjecting the ground treatment for steel tank to be designed and constructed in a safe, applicable, advanced, ecomonic, rational, qualified and environmental friendly manner.
1.0.2 This code is applicable to the design, construction and quality inspection with regards to the ground treatment for vertical and circular steel tank for storing the crude oil, petrifying liquid products and other similar liquid (hereinafter referred to as "ground treatment for tank").
1.0.3 The ground treatment for tank shall comply with the requirements for engineering design but use local materials in accordance with the requirements of engineering design and local conditions, so as to meet the requirements of environmental protection and resources conservation.
1.0.4 In addition to meeting this code, the ground treatment for tank shall comply with those in the current relevant ones of the nation.
2 Terms and Symbols
2.1 Terms
2.1.1 Composite foundation
Ground whose partial soil mass is strengthened or replaced by reinforcement and whose loads are shared by reinforcement and surrounding subsoil.
2.1.2 Cushion
A ground treatment method, by which the soft soil layer at the shallow ground surface or nonuniform soil layer is cut while the hard materials of large particle diameter are backfilled, compacted or tamped, forming a compacted cushion.
2.1.3 Hydrostatic preloading
A ground treatment method, by which the ground is preloaded by the filling loads in the tank when the tank is being filled with water for testing the pressure so that the ground is consolidated and compacted.
2.1.4 Dynamic compaction, dynamic consolidation
A ground treatment method, by which the pounder is raised to a high place time after time and falls free to give the subsoil shock and vibration energy to compact the subsoil.
2.1.5 Dynamic replacement
A ground treatment method, by which the gravel pier is formed in the ground by dynamic compaction together with filling gravel and the composite foundation is formed by gravel pier, soil between piers and upside gravel cushion.
2.1.6 Vibroflotation, vibro-replacement
A ground treatment method, by which the loose sand-soil layer is compacted or the soft soil layer is holed by the combined action of horizontal vibration of vibrator and pressure water; then the coarse-particle materials like gravels are backfilled to form the column body which constitutes the composite foundation together with the original subsoil.
2.1.7 Sand-gravel column
A ground treatment method, by which the hole is made in the ground by vibration, impact or water flush to extrude the gravel, sand or sand-gravel into the hole so that the sand-gravel compaction pile is formed and constitute the composite foundation with the original soil between columns.
2.1.8 Cement-flyash-gravel pile
A ground treatment method, by which the pile body is formed by the mixture like cement, flyash, gravel, stone chips or sand together with the water and constitute the composite foundation together with piles and soil between piles.
2.1.9 Cement-solid deep mixing pile
A ground treatment method, by which the curing agent is mixed with the subsoil by force by the deep mixer, using the cement as the main composition of curing agent, to form the pile bodys with entirety, water stability and strength, which constitutes the composite foundation together with the soil between piles and the filler layer.
2.1.10 Lime-soil compaction column
A ground treatment method, by which the hole is formed by the equipment through the lateral compression to compact the soil between piles. The pile hole is filled with the soil-lime to form the compacted soil-lime columns by tamping in layers, which constitutes the composite foundation together with the soil between piles.
2.1.11 Reinforced-concrete pile composite foundation
A ground treatment method, by which the composite foundation is formed by pile and soil between piles, using the reinforced-concrete pile as the vertical reinforcement.
2.2 Symbols
Contents
Foreword I
1 General Provisions
2 Terms and Symbols
2.1 Terms
2.2 Symbols
3 Basic Requirement
4 Cushion
4.1 General Requirement
4.2 Design
4.3 Construction
4.4 Quality Inspection
5 Hydrostatic Preloading
5.1 General Requirement
5.2 Design
6 Dynamic Compaction and Dynamic Replacement
6.1 General Requirement
6.2 Design
6.3 Construction
6.4 Quality Inspection
7 Vibroflotation
7.1 General Requirement
7.2 Design
7.3 Construction
7.4 Quality Inspection
8 Sand-gravel Column
8.1 General Requirement
8.2 Design
8.3 Construction
8.4 Quality Inspection
9 Cement-flyash-gravel Pile
9.1 General Requirement
9.2 Design
9.3 Construction
9.4 Quality Inspection
10 Cement-soil Deep Mixing Pile
10.1 General Requirement
10.2 Design
10.3 Construction
10.4 Quality Inspection
11 Lime-soil Compaction Column
11.1 General Requirement
11.2 Design
11.3 Construction
11.4 Quality Inspection
12 Reinforced-concrete Pile Composite Foundation
12.1 General Requirement
12.2 Design
12.3 Construction
12.4 Quality Inspection
Appendix A Key Points of Composite Foundation Static Loading Test
Explanation of Wording in This Code
List of Quoted Standards

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/T 32322.1-2015 in English
Rolling bearings - Profiled rail guides for linear motion rolling bearings - Part 1: Boundary dimensions and tolerances for series 1, 2 and 3
2015-12-31 -

GB/T 43428-2023 in English
Digital analytics and web analyses for purposes of market|| opinion and social research—Vocabulary and service requirements
2023-12-28 -

GB/T 31757-2015 in English
Preservative-treated wood decking
2015-07-03 -

GB/T 35932-2018/XG1-2021 in English
Carding cotton wadding,includes Amendment 1
2021-08-20 -

GB/T 15432-1995/XG1-2018 in English
Ambient air--Determination of total suspended particulates--Gravimetric method, includes Amendment 1
1995-01-04 -

GB/T 5193-2020 in English
Method of ultrasonic inspection for wrought titanium and titanium alloy products
2020-03-06 -

GB/T 17105-2024 in English
Classification of aluminum-silicon dense shaped refractory products
2024-05-28 -

GBJ 2427-1995 in English
Methods for laser gyroscope test
1999-05-31 -

GB/T 11563-1995 in English
Motor vehicles--Procedure for H-point determination
- -

GB 20799-2016 in English
Fresh and frozen meat transport condition
2016-12-23