MH/T 2014-2023 in English
VALIDGeneral requirements for civil unmanned aircraft system logistics operation Part 1: Island scenario
- Issued on:2023-10-30
- Implemented on:2023-11-01
- File Format:PDF
- Delivery:Via email within 5 business days
$418.00
| Standard No: | MH/T 2014-2023 |
| Document status: | VALID |
| Title in English: | General requirements for civil unmanned aircraft system logistics operation Part 1: Island scenario |
| Title in Chinese: | 民用无人驾驶航空器系统物流运行通用要求 第1部分:海岛场景 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2023-10-30 |
| Implemented on: | 2023-11-01 |
| Professional Classification: | MH-Civil Aviation |
| Related Topics: | mh/t
mh/t 6107-2014 mh/t 6102-2014 mh/t6108-2014 mh/t 6103-2014 Uninhabited island mh/t6107-2014 mh/t 6104-2014 Autonomous driving standards General purpose for military unmanned aerial vehicles |
Introduction
Analysis of the core framework of the standard
| Dimensions | Special requirements for island scenarios | General basic requirements |
|---|---|---|
| Environmental adaptability | Salt spray/mold protection, airspeed meter heating atomization | Basic waterproof and dustproof |
| Positioning accuracy | Differential enhancement 1m (take-off and landing area) | Single GNSS 10m |
| Wind resistance | Flight ≥ Level 6/Take-off and landing ≥ Level 4 | No scene classification |
Detailed explanation of key technical indicators
1. Operation control system
The system needs to meet 24-hour uninterrupted operation. Key data include:
- Track monitoring (≤30 seconds refresh)
- Real-time status of energy source
- Dynamic update of geo-fence
Communication performance requirements:
| Indicator | Requirement |
|---|---|
| Delay | ≤2000ms |
| Switching time | ≤1 second |
| Packet loss rate | <10⁻³ |
2. Special adaptability to islands
UAV system must pass:
- Salt spray test: simulates marine atmospheric corrosion environment
- Wet heat cycle: temperature 40℃±2℃/humidity 93%±3%
- Wind resistance verification: stable flight in level 6 wind (10.8-13.8m/s)
Implementation suggestions
Phase deployment plan
| Phase | Work focus | Acceptance criteria |
|---|---|---|
| Preliminary preparation | Route survey/airspace declaration | Obtain authority operation approval |
| System verification | Appendix A/B test items | Third-party certification passed |
| Trial operation | 50 verification flights | Data integrity rate ≥ 99.9% |
Common risk response
C2 link interruptionHandling process:
- Automatically switch to backup data link (≤1 second)
- Trigger the preset return route
- Start maritime satellite communication backup

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

MH/T 5115-2017 in English
Technical requirements for stationary anti-bird laser devices
2017-06-06 -

MH/T 0067-2018 in English
Security testing guide for Web application system of civil aviation
2018-12-14 -

MH/T 5014-2022 in English
Technical specifications for construction of airfield earthwork and pavement base
2022-03-29 -

MH/T 4016.7-2008 in English
Civil aviation meteorology-part 7:climatological information reorganization and analysis
2008-01-29 -

MH 5001-2021 in English
Aerodrome technical standards
2021-09-18 -

MH/T 9006-2014 in English
Calculating methods of gaseous emissions for aircraft gas turbine engines
2014-07-29 -

MH/T 6080-2012 in English
Quality control for commercial aviation fuel transported by long pipeline
2012-04-10 -

MH/T 3024-2013 in English
Specification of engine fuel pump and fuel metering unit test equipment
2013-03-13 -

MH/T 5065.3-2023 in English
Technical guidance for site selection of general aviation aerodrome-Part 3:Water aerodrome
2023-06-16 -

MH/T 6004-2015 in English
Oil metrology supervision of civil aviation
2015-06-02