Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
internal events nuclear power plant applications nuclear power units nuclear power plants at-low power airport passenger shuttles processing hardened steel carbide alloy standardized meat
NB/T 20037.2-2012 in English

NB/T 20037.2-2012 in English

SUPERSEDED

Probabilistic Safety Assessment for Nuclear Power Plant Applications - Part 2: Level 1 PSA for Internal Events At-low Power and Shutdown

  • Issued on:2012-01-06
  • Implemented on:2012-04-06
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $750.00
$728.00
Standard No: NB/T 20037.2-2012
Document status: SUPERSEDED
Superseded by: NB/T 20037.2-2021 PSA Probabilistic safety assessment for nuclear power plant applications - Part 2 : internal events at-low power and shutdown
Superseded on: 2021-07-01
Title in English: Probabilistic Safety Assessment for Nuclear Power Plant Applications - Part 2: Level 1 PSA for Internal Events At-low Power and Shutdown
Title in Chinese: 应用于核电厂的概率安全评价 第2部分:低功率和停堆工况内部事件一级PSA
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2012-01-06
Implemented on: 2012-04-06
Professional Classification: NB-Energy
Related Keywords: internal events
nuclear power plant applications
nuclear power units
nuclear power plants
at-low power
Related Topics: nb/t 20186-2012
NB/T+20186-2012
nb/t20039.3-2012
nb/t20119-2012
nb/t 20192-2012
Level 1 Probabilistic Safety Assessment Applied to Nuclear Power Plants Part 4
nb/t 20039.3-2012
nb/t20039.8-2012
psa application
nb/t20133.6-2012
low power
nb/t 20182-2012
nb/t 20136-2012
nb/t 20193-2012
NB/T31022-2012
NB/T 20445.3-2021 Level 2 probabilistic safety assessment applied to nuclear power plants Part 3
nb/t20193-2012
nb/t47025-2012
nb/t47021-2012
nb/t 20139-2012
nb/t 20123-2012
nb/t 20185-2012
nb/t 20194-2012
nb/t47023-2012
nb/t 47022-2012
nb/t47024-2012
nb/t20125-2012
nb/t 47027-2012
nb/t10558-2012
nb/t47022-2012
nb/t 20247-2012
nb/t20096-2012
nb/t 47021-2012


Scope

This part specifies the relevant requirements for the first-level probabilis ic safety assessment (PSA) of internal events in low power and shutdown conditions to ensure that standardized PSA models that meet the corresponding quality requirements are developed for nuclear power units of different design schemes. This section is applicable to the first-level PSA for internal events (but not including internal dis sters, such as internal flooding, internal fire, etc.) under low power and shutdown conditions of light water pressurized water reactor nuclear power plants during the design stage, construction stage and operation stage. Nuclear power plants with other reactor types can refer to this implementation. The radioactive source terms involved in this section only consider radioactivity from the core fuel.

Sample only — not a preview of NB/T 20037.2-2012
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend