NB/T 20113-2012 in English
VALIDTechnical Regulation for Construction of HVAC Installation in PWR Nuclear Power Plant
- Issued on:2012-01-06
- Implemented on:2012-04-06
- File Format:PDF
- Delivery:Via email within 1~3 business days
$321.00
Scope
This standard specifies the technical requirements and quality standards for the installation and construction of ventilation systems in nuclear is and buildings of pressurized water reactor nuclear power plants. This standard is applicable to the installation and construction of the ventilation system of the nuclear is and plant in the new and expansion projects of pressurized water reactor nuclear power plants. Maintenance projects can be implemented with reference. In this standard, the scope of construction activities refers to the entire construction process from the receipt of bulk materials for ducts, ventilation equipment and other finis ed components to the commis ioning of the ventilation system.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/T 10766-2021 in English
Determination of moisture in lignocellulosic feedstocks-Near-infrared method
2021-11-16 -

NB/T 25066-2017 in English
Management requirement for maintenance of non-nuclear safety equipment in nuclear power plant
2017-02-10 -

NB/T 47008-2017 in English
Carbon and alloy steel forgings for pressure equipment
2017-03-28 -

NB/T 34071-2018 in English
Test method for domestic solar water heating system
2018-06-06 -

NB/T 20007.37-2015 in English
Stainless steel for pressurized water reactor nuclear power plants-Part 37:Austenitic stainless steel bars used for non-pressure-retaining components of CRDM
2015-04-02 -

NB/T 20337-2015 in English
Seismic qualification of class 1E metal-enclosed switchgear assemblies in nuclear power plants
2015-04-02 -

NB/T 20154-2012 in English
Guideline of Ageing Management for PWR Reactor Pressure Vessels
2012-10-19 -

NB/T 11082-2023 in English
Specification for Preparation of Planning Report for Wind/Solar/Hydro/Fossil Fuel/Energy Storage Hybrid Power Projects
2023-02-06 -

NB/T 10907-2021 in English
Code for Design of Concrete-Steel Hybrid Tower of Win Turbine
2021-12-22 -

NB/SH/T 6069-2023 in English
Standard test method for determination of boiling range distribution of hydrocarbonand nitrogen components in petroleum distillates - Gas chromatography
2023-02-06