Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
construction quality acceptance construction quality construction quality supervision appendices new content-shielding construction acceptance requirements lightning protection devicesspecification numbering rules operating isolation switch method traditional method accuracy ±0.5 % ±2.0 % detection cycle
QX/T 105-2018 in English

QX/T 105-2018 in English

VALID

Specifications for acceptance of construction quality of lightning protection system

  • Issued on:2018-12-12
  • Implemented on:2019-04-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $410.00
$398.00


Introduction

Core Changes of the Specification Revision

Change Type2009 Edition2018 Edition
Standard NameSpecification for Construction Quality Supervision and Acceptance of Lightning Protection DevicesSpecification for Construction Quality Acceptance of Lightning Protection Devices
Chapter Structure19 Chapters + 6 Appendices11 Chapters + 2 Appendices
New Content-Shielding Construction Acceptance Requirements (Chapter 9)
Key locationsScattered in various chaptersIntegrated into normative Appendix B

Analysis of key acceptance indicators

1. Grounding device requirements

The spacing between artificial grounding electrodes should be maintained at 5m, the burial depth should be >0.5m, and the distance from the building foundation should be ≥1m.

  • Flat steel-flat steel: ≥2 times the width
  • Round steel-round steel: ≥6 times the diameter

2. Downconductor Installation

Laying methodFixed spacingBending radius
Exposed horizontal conductor500mm (flat steel)
1000mm (round steel)
≥10 times the diameter/6 times the width
Vertical conductorUniform 1000mm

Key points for acceptance in special locations

1.

Special attention should be paid to gas stations:

  1. Storage tank flange transition resistance ≤ 0.03Ω
  2. SPD installation location should avoid explosion-proof areas
  3. Metal pipes need to be jumpered every 30m

2. Petrochemical plants

Floating roof tank requirements:

  • Connecting wire cross-sectional area ≥ 50mm²
  • Connection point spacing ≤ 18m
  • Drainage pipes need to be jumpered separately

Key parameters for SPD installation

Equipment typeImpact voltage (kV)Connection line length limit
Class I (electronic equipment)1.5≤0.5m (or Kevin wiring)
Class III (distribution equipment)4
Voltage-limiting SPD spacing≥5m

Implementation suggestions

  1. Concealed projects must retain weld photos and ground resistance test records
  2. Key locations should undergo special testing of transition resistance
  3. SPDs must undergo Up/f value verification after installation
  4. Concealed lightning conductors should be used as a priority for lightning protection in historic buildings