Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
meteorological video conference system operation introduction standard overview terminal access management document management specifications chapter meteorological video maintenance management full system cesium content shrink chuck scopethis standard rare ginsenoside rh2
QX/T 253-2014 in English

QX/T 253-2014 in English

VALID

Specifications for management of meteorological video conference system operation

  • Issued on:2014-10-24
  • Implemented on:2015-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $240.00
$233.00
Standard No: QX/T 253-2014
Document status: VALID
Title in English: Specifications for management of meteorological video conference system operation
Title in Chinese: 气象电视会商系统运行管理规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2014-10-24
Implemented on: 2015-03-01
Professional Classification: QX-Meteorology
Related Keywords: meteorological video conference system operation introduction standard overview
terminal access management document management specifications chapter
meteorological video
maintenance management
full system
Related Topics: post run gas phase
run after gas phase
QX
run after gas phase


Introduction

Standard Overview and Technical Background

QX/T 253-2014, as the core standard of the meteorological industry, establishes full-process specifications for the operation and maintenance management of the meteorological video conferencing system. This standard is based on GB/T 1.1-2009 and was proposed by the National Meteorological Basic Information Standardization Technical Committee, reflecting the need for the deep integration of video conferencing technology and meteorological services around 2014.


Analysis of core elements

Management dimension QX/T 253 requirements General industry requirements Technical differences
Access management 3-hour business trial run General 1-hour test Fault reset timing mechanism
Application for use 24-hour pre-approval Generally 12 hours Emergency 1-hour exception
Security level Security protection level 2 Most of them have no clear requirements Emergency handling rights for audio and video

Implementation points and cases

Practical operation of operation guarantee

Taking the provincial meteorological observatory as an example, the control center needs to establish:

  • Dual-post duty system to ensure debugging 30 minutes before the meeting
  • Monthly full system joint debugging includes MCU equipment stress testing
  • The maintenance cycle of venue equipment is strictly controlled within 14 days±2 days

Special security management

Article 7.1 of the standard clearly requires that the system reach Security Protection Level 2. The specific implementation requires:

  1. The control center deploys a behavior audit system
  2. SRTP encryption protocol is used for video streaming transmission
  3. Establish a whitelist system for terminal access management

Document Management Specifications

Chapter 8 of the standard stipulates that five types of key documents need to be preserved:

Document type Shelf life Electronic requirements
Equipment change record ≥5 years Digital signature required
Fault handling report ≥3 years With repair evidence

Sample only — not a preview of QX/T 253-2014
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend