This code specifies construction requirement and quality standard for vertical in petrochemical factory area. This code is applicable to construction and acceptance for vertical engineering in petrochemical engineering construction, renovation and expansion project factory area.
Foreword
1 Scope
2 Normative references
3 Terminologies and definitions
4 General provision
5 Earth and stone work engineering
5.1 General requirement
5.2 Temporary drainage
5.3 Ground
5.4 Earth work of foundation trench
6 Ground works
6.1 General requirement
6.2 Substrate
6.3 Concrete pavement
6.4 Quality standard of ground layers
7 Road in factorial areas
8 Small scale structures
8.1 Fire bank
8.1.1 Brick and stone bank
8.1.2 Reinforced concrete bank
8.2 Concrete cofferdam
8.3 Trench
8.4 Retaining wall
8.4.1 Foundation and groundwork
8.4.2 Walling
8.4.3 Backfill and inverted filter of wall back
8.4.4 Wall toe and wall crest
8.4.5 Settlement joint and expansion joint
8.5 Slope protection
8.5.1 General requirement
8.5.2 Slope protection construction
8.6 Culvert pipe and culvert
8.7 Flyover bridge, crossover ladder and bench step
9 Engineering acceptance
Appendix A (Informative) Permissible Flow Velocity of Water in Drain
Appendix B (Informative) Classification and Usability of Saline Soil
Appendix C (Normative) Compacting Factor of Filled-in Ground
Explanation of words in this Code