Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

Factory System Acceptance

Factory System Acceptance, Total:129 items.

The international standard classification for "Factory System Acceptance" includes: Solar energy engineering , External sewage systems , Buildings , Hydraulic energy engineering , Industrial process measurement and control , Power stations in general , Other standards related to road engineering .

The Chinese standard classification for "Factory System Acceptance" includes: Technical management , Textile industry engineering , Nuclear industry engineering , Mine and coal engineering , Metallurgical industry engineering , Outdoor water supply and draining engineering , Residential and public building engineering , Electric power system equipment installation testing , Electric power testing technique , Industrial control and computer application equipment , Power station equipment automation devices , Industrial automation and control device in general , Power plant and electric power system operating maintenance , , Petrochemical and chemical industry engineering , Broadcasting, movie and television engineering .


Group Standards of the People's Republic of China

  • T/CNEA 006.6-2021 Technical and management specification for wireless communication system of nuclear power plants—Part 6:System acceptance
  • T/CEC 177-2018 Definition, test methods and acceptance criteria of factory composite porcelain or glass insulators for AC and DC systems
  • T/CASME 1540-2024 Specification for the construction and inspection of finishing and decoration in industrial cleanroom
  • T/CSPSTC 28-2019 Acceptance specification for thin film solar new factory

Ministry of Housing and Urban-Rural Development of the People's Replublic of China

  • GB 50956-2013 Acceptance Specification for Chemical Fiber Factory
  • GB 51110-2015 Code of construction and quality acceptance of industrial cleanroom
  • GB 50334-2002 Quality acceptance code for municipal sewage treatment plant engineering
  • GB 50937-2013 Code for Construction and Acceptance of Piping Installation in Coal Preparation Plant
  • GB/T 50312-2016 Code for engineering acceptance of generic cabling system
  • GB 50334-2017 Code for quality acceptance of municipal wastewater treatment plant engineering
  • GB/T 51012-2014 Code for construction and acceptance of process gas piping in uranium enrichment plant
  • GB 51005-2014 Code for construction and acceptance of waste heat recovery power generation in cement plant
  • GB 50825-2013 Code for quality acceptance of reheating furnaces in iron and steel works
  • GB 50312-2016 Code for engineering acceptance of generic cabling system
  • GB/T 50975-2014 Code for construction and acceptance of process water piping in uranium enrichment plant
  • GB 50312-2007 Code for Engineering Acceptance of Generic Cabling System

Professional Standard - Energy and Power Planning

  • DL/T 655-2017 Code for acceptance test of furnace safeguard supervisory system in fossil fuel power plant
  • DL/T 657-2006 Code for acceptance test of modulating control system in fossil fuel power plant
  • DL/T 657-2015 Code for Acceptance Test of Modulating Control System in Fossil Fuel Power Plant
  • DL/T 657-1998 Code for On-line Acceptance Test of Modulating Control System in Fossil Fuel Power Plant
  • DL/T 822-2012 Code of test and adcceptance of monitoring and control system for hydropower plants
  • DL/T 656-2006 Code for acceptance test of turbine control system in fossil fuel power plant
  • DL/T 5762-2018 Installation and acceptance code for centralized supervision and control system of cascade hydropower plants
  • DL/T 659-2016 Code of practice for acceptance test of distributed control system in fossil fuel power plant
  • DL/T 1645-2016 Acceptance specification of absorption heat pump project for fossil fuel power plants
  • DL/T 822-2024 Test and acceptance procedures for computer monitoring system of hydropower plants
  • DL/T 656-1998 Code for on-line acceptance test of turbine control system in fossil fuel power plant
  • DL/T 822-2002 Code for Test and Acceptance of Computer Monitoring and Control Sy
  • DL/T 822-2012(英文版) Test and acceptance procedures for computer monitoring systems in hydropower plants
  • DL/T 658-2006 Code for on-line acceptance test of sequence control system in fossil fuel power plant
  • DL/T 5257-2010 Specification for construction acceptance of thermal power plant flue gas denitration project
  • DL/T 2781-2024 Acceptance test procedures for thermal power plant-level supervision information system
  • DL/T 658-1998 Code for On-line Acceptance Test of Sequence Control System in Fossil Fuel Power Plant
  • DL/T 659-2006 Code for acceptance test of distributed control system in fossil fuel power plant
  • DL/T 1670-2016 Code for construction and acceptance of exhaust steam duct of thermal power plant air-cooled condense
  • DL/T 5418-2009 Code for construction and acceptance of flue gas desulphurization absorber of thermal power plant
  • DL/T 5853-2022 Specifications for construction and acceptance of chimney projects in thermal power plants
  • DL/T 658-2017 Acceptance test procedure for switch quantity control system in thermal power plant
  • DL/T 659-1998 Code for On-line Acceptance Test of Distributed Control System in Fossil Fuel Power Plant

Hubei Provincial Standard of the People's Republic of China

  • DB42/T 719-2011 Slave stations side of electric power system code of automation system for site acceptance test

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB/T 25737-2010 Acceptance norms for 1 000 kV substation monitoring system
  • GB/T 25928-2010 Automation systems in the process industry—Factory acceptance test (FAT) site acceptance test (SAT) and site integration test (SIT)
  • GB/T 30372-2024 Guide for acceptance of distributed control system for thermal power plant
  • GB/T 40284-2021 Guide for energy saving test of waste heat recovery system in power plant
  • GB/T 30372-2013 Guide for Acceptance of Distributed Control System in Fossil Fuel Power Plant

Professional Standard - Energy

  • NB/T 25086-2018 The code of welding quality acceptance for conventional island of nuclear power plant
  • NB/T 20128-2023 Specifications for construction and acceptance of foundation pits for nuclear islands in nuclear power plants
  • NB/T 20124-2023 Specifications for construction and acceptance of shielding concrete for nuclear power plants
  • NB/T 51042-2015 The Specification for Construction and Acceptance of Architectural Engineering in Coal Preparation Plant
  • NB/T 25095-2018 Specification for anticorrosion construction and acceptance of the marine works in nuclear power plants
  • NB/T 20128-2012 Specifications on Construction and Acceptance of Nuclear Island Foundation Pit
  • NB/T 20398-2017 Construction and inspection specification for reactor building internal structure of PWR nuclear power plant
  • NB/T 25040-2014 Non-safety classified digital control system in nuclear power plants factory acceptance test(FAT),site acceptance test (SAT),and site integration test(SIT)
  • NB/T 20126-2023 Technical regulations for caulking construction and acceptance of nuclear island buildings in pressurized water reactor nuclear power plants
  • NB/T 20126-2012 Specifications for Construction and Acceptance of Caulking of PWR Nuclear Island Plant

Professional Standard - Petrochemical Industry

  • SH/T 3529-2018 Specification for construction and acceptance of vertical engineering in petrochemical plant areas
  • SH/T 3562-2017 Specification for piping shop fabrication and acceptance in petrochemical industry
  • SH/T 3529-2005 Code of Construction and Acceptance for Vertical Engineering in P

Professional Standard - Building Materials

  • JCJ 03-1990 Code for quality acceptance of cement mechanical equipment installation engineering

Professional Standard - Post and Telecommunication

  • YD 5033-1997 Code for Acceptance of Videoconference System Engineering
  • YD/T 5033-2018 Acceptance Specifications for Videoconference System Engineering
  • YD/T 5033-2005 Acceptance Specifications of Videoconference System Engineering

Shanghai Provincial Standard of the People's Republic of China

Association Francaise de Normalisation

  • NF C46-071:2014 Atomation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)
  • NF EN 62381:2015 Systèmes d'automatisation pour les procédés industriels - Essais d'acceptation en usine (FAT), essais d'acceptation sur site (SAT) et essais d'intégration sur site (SIT)
  • NF C46-071*NF EN 62381:2015 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
  • NF C46-071*NF EN IEC 62381:2024 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
  • NF EN IEC 62381:2024 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

British Standards Institution (BSI)

  • BS EN 62381:2012 Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)
  • BS EN 62381:2007 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
  • BS EN IEC 62381:2024 Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
  • 10/30233206 DC BS EN 62381. Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
  • 23/30426460 DC BS EN IEC 62381. Automation systems in the process industry. Factory acceptance test (FAT); site acceptance test (SAT); and site integration test (SIT)
  • 05/30140365 DC IEC 62381. Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the Process Industry
  • PAS 62381-2004 Activities during the factory acceptance test (FAT)@ site acceptance test (SAT)@ and site integration test (SIT) for automation systems in the process industry (Edition 1.0)
  • BS EN 12976-2:2006 Thermal solar systems components - Factory made systems - Test methods
  • BS EN 12976-2:2017 Thermal solar systems and components. Factory made systems. Test methods
  • BS EN 12976-2:2001 Thermal solar systems and components. Factory made systems-Test methods
  • BS ISO 28593:2017 Acceptance sampling procedures by attributes. Accept-zero sampling system based on credit principle for controlling outgoing quality

American National Standards Institute (ANSI)

  • ANSI/ISA 62381-2012 Automation Systems in the Process Industry - Factory Acceptance Test (FAT), Site Acceptance Test (SAT), and Site Integration Test (SIT)
  • ANSI/ISA 62381-2011 Automation Systems in the Process Industry – Factory Acceptance Test (FAT), Site Acceptance Test (SAT), and Site Integration Test (SIT)

Gosstandart of Russia

  • GOST R IEC 62381-2016 Automation systems in the process industry. Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

Korean Agency for Technology and Standards (KATS)

  • KS C IEC 62381-2008 Automation systems in the process industry-Factory acceptance test(FAT), site acceptance test(SAT), and site integration test(SIT)
  • KS C IEC 62381:2013 Automation systems in the process industry-Factory acceptance test(FAT), site acceptance test(SAT), and site integration test(SIT)
  • KS C IEC 62381:2008 Automation systems in the process industry-Factory acceptance test(FAT), site acceptance test(SAT), and site integration test(SIT)
  • KS C IEC 62381-2013 Automation systems in the process industry-Factory acceptance test(FAT), site acceptance test(SAT), and site integration test(SIT)
  • KS Q ISO 28593-2019(2024) Acceptance sampling procedures by attributes —Accept-zero sampling system based on credit principle for controlling outgoing quality
  • KS A ISO 18414:2008 Acceptance sampling procedures by attributes-Accept-zero sampling system based on credit principle for controlling outgoing quality
  • KS A ISO 18414:2015 Acceptance sampling procedures by attributes-Accept-zero sampling system based on credit principle for controlling outgoing quality

German Institute for Standardization

  • DIN EN 62381:2007 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) (IEC 62381:2006); German version EN 62381:2007
  • DIN EN 62381:2013 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) (IEC 62381:2012); German version EN 62381:2012, with CD-ROM
  • DIN EN 62381 E:2011-01 Draft Document - Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) (IEC 65E/165/CDV:2010); German version FprEN 62381:2010
  • DIN EN 62381 E:2011 Draft Document - Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) (IEC 65E/165/CDV:2010); German version FprEN 62381:2010
  • DIN EN 62381:2013-04 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) (IEC 62381:2012); German version EN 62381:2012, with CD-ROM
  • DIN EN 62381:2007-09 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) (IEC 62381:2006); German version EN 62381:2007

International Electrotechnical Commission (IEC)

  • IEC 62381:2006 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
  • IEC 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)
  • IEC PAS 62381:2004 Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry
  • IEC 62381:2024 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

Association of German Mechanical Engineers

GCC Standardization Organization

  • GSO IEC 62381:2015 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

Comitato Elettrotecnico Italiano

  • CEI EN 62381:2013 Automation systems in the process industry - Factory Acceptance Test (FAT), Site Acceptance Test (SAT) and Site Integration Test (SIT)
  • CEI EN IEC 62381:2024 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

ISA - International Society of Automation

  • ISA 62381-2011 Automation Systems in the Process Industry – Factory Acceptance Test (FAT)@ Site Acceptance Test (SAT)@ and Site Integration Test (SIT)

CENELEC - European Committee for Electrotechnical Standardization

  • EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT)@ site acceptance test (SAT) and site integration test (SIT)
  • EN 62381:2007 Automation systems in the process industry - Factory acceptance test (FAT)@ site acceptance test (SAT) and site integration test (SIT)

Spanish Association for Standardization (UNE)

  • UNE-EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) (Endorsed by AENOR in June of 2012.)
  • AENOR UNE-EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) (Endorsed by AENOR in June of 2012.)

The Directorate General of Specifications and Metrology (DGSM)

  • OS GSO IEC 62381:2015 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

Danish Standards Foundation

  • DS/EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)
  • DS/EN 62381:2007 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)
  • DANSK DS/EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)

Kingdom of Bahrain Testing and Metrology Directorate

  • BH GSO IEC 62381:2015 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

Swedish Institute for Standards

  • SS-EN 62381:2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT)

European Committee for Electrotechnical Standardization(CENELEC)

  • EN IEC 62381:2024 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT)

International Telecommunication Union (ITU)

Lithuanian Standards Office

  • LST EN 62381-2012 Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT) and site integration test (SIT) (IEC 62381:2012)

American Water Works Association (AWWA)

  • AWWA ACE63039 Unified Plant Process Control: Merging Two HMI/PLC Control Systems for a Membrane Plant and a Conventional Plant

Association for Electrical, Electronic & Information Technologies (VDE)

  • VDE 0810-81-2013 Automation systems in the process industry - Factory acceptance test (FAT)@ site acceptance test (SAT) and site integration test (SIT) (IEC 62381:2012); German version EN 62381:2012@ with CD-ROM

Ente Nazionale Italiano di Unificazione

  • UNI ISO 28593:2019 Acceptance sampling procedures by attributes -- Accept-zero sampling system based on credit principle for controlling outgoing quality

International Organization for Standardization (ISO)

  • ISO 18414:2006 Acceptance sampling procedures by attributes - Accept-zero sampling system based on credit principle for controlling outgoing quality
  • ISO 28593:2017 Acceptance sampling procedures by attributes - Accept-zero sampling system based on credit principle for controlling outgoing quality

European Committee for Standardization (CEN)

  • EN 12976-2:2000 Thermal Solar Systems and Compounds - Factory Made Systems - Part 2: Test Methods