Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
resettlement design water resources medium-sized water conservancy small water conservancy land requisition center distance adjustment blue kn-2g nuclear spectroscopy
SL 290-2009 in English

SL 290-2009 in English

SUPERSEDED

Specifications on land requisition and resettlement design for construction of water resources and hydropower project

  • Issued on:2009-07-31
  • Implemented on:2009-10-31
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $1,200.00
$1,164.00
Standard No: SL 290-2009
Document status: SUPERSEDED
Superseded by: SL/T 290-2024 Specification for planning and design of land acquisition and resettlement of immigrants for water conservancy and hydropower project construction
Superseded on: 2025-03-31
Title in English: Specifications on land requisition and resettlement design for construction of water resources and hydropower project
Title in Chinese: 水利水电工程建设征地移民安置规划设计规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2009-07-31
Implemented on: 2009-10-31
Superseding: SL 290-2003 Specifications on land requisition and resettlement design for construction of water resources and hydropower project
ICS Classification: 93.160-Hydraulic construction
Professional Classification: SL-Water Resources
Related Keywords: resettlement design
water resources
medium-sized water conservancy
small water conservancy
land requisition
Related Topics: water conservancy
hydropower project
Ministry of Water Resources
placement
Secondary Wiring Design of Water Conservancy and Hydropower Projects
planning standards
Construction
Construction
Water Resources and Hydropower
migrant
sl290-2009
land acquisition
The 14th Five-Year Plan for Engineering Construction
Chemical Design and Civil Design
Water Resources and Hydropower Engineering
Water Conservancy and Hydropower Engineering Safety Monitoring Design
Comprehensive resettlement design
Grounding Design of Industrial and Residential Power Installations
Grounding Design of Water Conservancy and Hydropower Projects
dl/t5113.1-2019 Hydropower and Water Conservancy Capital Construction Project
The latest design specifications for mobile power supplies
Classification and expression of spatial information in land acquisition and resettlement planning and design for water conservancy and hydropower project construction
Water conservancy and hydropower engineering automation design
Energy-saving design of water conservancy and hydropower projects
Hydropower station construction land standards
Standard design of relay room settings
Standard design requirements for relay room settings
Design of pressure steel pipes for water conservancy and hydropower projects

本标准适用于大中型水利水电工程建设征地移民安置规划设计工作。小型水利水电工程可参照本标准执行。


Scope

This standard is applicable to the planning and design of land acquisition and resettlement for the construction of large and medium-sized water conservancy and hydropower projects. Small water conservancy and hydropower projects can be implemented with reference to this standard.

Sample only — not a preview of SL 290-2009
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.