Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

Quality control of the testing process

Quality control of the testing process, Total:37 items.

The international standard classification for "Quality control of the testing process" includes: Industrial automation systems , Industrial process measurement and control , Application of statistical methods , Quality management and quality assurance .

The Chinese standard classification for "Quality control of the testing process" includes: Other automation devices , Mathematics , Technical management , Standardization and Quality Management .


Military Standard of the People's Republic of China-General Armament Department

  • GJB 2712A-2009 Quality control of measuring equipment and measurement processes in metrology support for military materiel
  • GJB 2366-1995 Quality control of trial production process

Military Standard of the People's Republic of China-Commission of Science,Technology and Industry for National Defence

国家市场监督管理总局、中国国家标准化管理委员会

  • GB/T 17989.9-2022 Statistical method of quality control in production process—Control charts—Part 9: Control charts for stationary processes
  • GB/T 41397-2022 Quality control of production process—Fault diagnostics
  • GB/T 41271-2022 Production process quality control—Communication conformance test
  • GB/T 37942-2019 Quality control of production process—Condition monitoring of equipment
  • GB/T 41272-2022 Production process quality control—General interface for quality data

Professional Standard - Electron

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

Beijing Provincial Standard of the People's Republic of China

  • DB11/T 2227-2024 Occupational Health Examination Quality Control Specifications Pure Tone Hearing Threshold Test

Professional Standard - Commodity Inspection

  • SN/T 2990-2011 Quality Control and Quality Evaluation. Index Evaluation Method of Process and Ability in Testing Laboratory

Group Standards of the People's Republic of China

  • T/CSEE 0229-2021 Quality Control of Thermal Spraying Process for Power Equipment
  • T/ZSQX 002-2018 Construction engineering total process quality control management regulation
  • T/CACM 1607-2024 Technical guidelines for quality control of Chinese medicine manufacturing process

SCC

  • BS ISO 10012-2:1997 Quality assurance for measuring equipment. Guidelines for control of measuring processes
  • BS 5703-3:1981 Guide to data analysis and quality control using cusum techniques-Cusum methods for process/quality control by measurement
  • CAN/CSA-ISO 10012-2-98:1998 Quality assurance of measuring equipment - Part 2: Guidelines for measuring process control

Association Francaise de Normalisation

  • NF UTE C46-501:1983 Measurement and control in industrial processes - Control valves - Tests and acceptance procedures
  • UTE C46-501U*UTE C46-501:1983 Industrial-process measurement and control. Control values. Acceptance tests and procedures.
  • NF C46-501:1983 Industrial-Process Measurement and Control Control valves Acceptance Tests and Procedures

Korean Agency for Technology and Standards (KATS)

  • KS A 10012-2-2004 QUALITY ASSURANCE FOR MEASURING EQUIPMENT-PART 2 : GUIDELINES FOR CONTROL OF MEASUREMENT PROCESSES
  • KS A 10012-2-1998(2003) QUALITY ASSURANCE FOR MEASURING EQUIPMENT-PART 2 : GUIDELINES FOR CONTROL OF MEASUREMENT PROCESSES

Spanish Association for Standardization (UNE)

  • UNE 66006:1974 IN HANDBOOK FOR QUALITY CONTROL DURING THE MANUFACTURE BASED ON THE SYSTEM OF THE CONTROL GRAPHIC.

Institute of Interconnecting and Packaging Electronic Circuits (IPC)

SAE - SAE International

  • SAE J661-2021 BRAKE LINING QUALITY CONTROL TEST PROCEDURE
  • SAE J661-1987 Brake Linings Quality Control Test Procedure@ Recommended Practice (August 1987)

Society of Automotive Engineers (SAE)

German Institute for Standardization

  • DIN 19242-1:1987-01 Measurement and control; performance tests on process computer systems; time measurement; test procedures
  • DIN 19242-1:1987 Measurement and control; performance tests on process computer systems; time measurement; test procedures

British Standards Institution (BSI)

  • BS 5700:1984 Guide to process control using quality control chart methods and cusum techniques

Japanese Industrial Standards Committee (JISC)

  • JIS B 3502:2021 Industrial-process measurement and control -- Programmable controllers -- Equipment requirements and tests

International Organization for Standardization (ISO)

  • ISO 10012-2:1997 Quality assurance for measuring equipment - Part 2: Guidelines for control of measurement processes

American National Standards Institute (ANSI)