DL/T 367-2010 in English
SUPERSEDEDSpecification of instrumentation and control for large scale fan in fossil fuel power plant
- Issued on:2010-05-01
- Implemented on:2010-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$117.00
本标准规定了火力发电厂大型风机本体范围的检测与控制基本要求,以及设备的试验和验收要求。
本标准适用于配套额定蒸发量为1000t/h等级及以上的燃煤锅炉的大型风机,即送风机、引风机、一次风机、二次风机、高压流化风机以及脱硫系统的增压风机。
Scope
This standard specifies the basic requirements for detection and control of large-scale wind turbines in thermal power plants. and equipment testing and acceptance requirements. This standard is applicable to large fans supporting coal-fired boilers with a rated evaporation capacity of 1000t/h and above, namely supply air fans, induced draft fans, primary air fans, secondary air fans, high-pressure fluidizing fans and booster fans of desulfurization systems. For large fans equipped with other rated evaporation capacity coal-fired boilers, you can also refer to them.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 829-2002 in English
Technical reqirements for stoking single phase alternating current induction watt-hour meter
2002-09-16 -

DL/T 5403-2007 in English
Specification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant
2007-12-03 -

DL/T 782-2001 in English
Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above
2001-10-08 -

DL/T 812-2002 in English
Insulators string for overhead lines with a normal voltage above 1000V-AC power arc test method
2002-04-27 -

DL/T 851-2004 in English
Acceptance tests for combined-cycle power plants
2004-03-09