Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
test methods test temperature load test no-load test locked-rotor test felt tert-butyl peroxy benzoate standardized preliminary design depth requirements
GB/T 1032-2012 in English

GB/T 1032-2012 in English

SUPERSEDED

Test procedures for three-phase induction motors

  • Issued on:2012-06-29
  • Implemented on:2012-11-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $350.00
$340.00
Standard No: GB/T 1032-2012
Document status: SUPERSEDED
Superseded by: GB/T 1032-2023 Iron ores—Determination of specific surface area—Test method using air-permeability apparatus (Blaine)
Superseded on: 2024-04-02
Title in English: Test procedures for three-phase induction motors
Title in Chinese: 三相异步电动机试验方法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2012-06-29
Implemented on: 2012-11-01
Superseding: GB/T 1032-2005 Test procedures for three-phase induction motors
Chinese Classification: K22-Asynchronous machine
Professional Classification: GB-National Standard
Related Keywords: test methods
test temperature
load test
no-load test
locked-rotor test
Related Topics: Abnormal EMG
footwork footwork
Method of dispensing mobile phase
Three-phase fireproof motor
Three-phase fireproof motor
mobile phase method
td/t 1032
step
Quantitative three-step method
National related third parties
Method mobile phase
Third Party Third Party Acceptance
third party test
GB T1032 2012
Two-step method Three-step method
GB+T1032+2012
Aura
mobile phase is organic
Testing machine motor
gb/t1032
Two-step method Three-step method
mobile phase organic phase ph
Two-step and three-step methods
Quantitative two-step method three-step method
Specific camera
test third party
mobile phase method
three-tone three-phase
Three-step method and two-step method
quantitative gait
three-tone three-phase
Three-phase trim method
GA/T 1032
GB/T1032-2012
GBT1032
GB/T 1032-2005
GB/T 1032-2012
Three-phase asynchronous motor
Three-phase asynchronous motor test method
electric motor
asynchronous
GB/T 1032
The difference between two-step and three-step PCR
The difference between two-step and three-step qPCR methods
Test methods for three-phase dry inductors
qPCR two-step method and three-step method
Three-phase energy meter calibration method
The difference between two-step and three-step qPCR methods
Three-phase asynchronous motor leakage
Three-phase asynchronous motor certification
Bromotriazine test method
Three-phase asynchronous motor standard list
Three-phase asynchronous motor core
Three-phase asynchronous motor execution
Standard three-phase asynchronous motor
Principles and methods of dynamic triaxial testing
Three-phase asynchronous motor standard parameters
Micro three-phase asynchronous motor technology
Three-phase asynchronous motor withstand voltage test
Three-phase asynchronous motor low voltage
What is the European standard three-phase asynchronous motor standard?
Braking method of three-phase AC motor
Three-phase AC asynchronous motor
Normal phase isomer method establishment
Three-phase asynchronous motor test
gb1032
gb/t1032-2023
gb/t 1032-2012
gb 1032
gb/t 1032-2005
gb t1032
gb-t1032
gbt1032-2012
t/cnha 1032
Mobile phase preparation method
gbt1032
gb/t1032-2005
gb/t1032 2023
gbt1032-2023

《GB/T 1032-2012三相异步电动机试验方法》由TC26(全国旋转电机标准化技术委员会)归口,主管部门为中国电器工业协会。


1 Scope

This standard specifies the test requirements and test methods for three-phase induction motors.

This standard is applicable to three-phase induction motors.

2 Normative References

The following referenced documents are indispensable for the application of this document. For dated reference, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

GB 755-2008 Rotating Electrical Machines-Rating and Performance
GB 10068-2008 Mechanical Vibration of Certain Machines with Shaft Heights 56mm and Higher - Measurement Evaluation and Limits of Vibration Severity
GB/T 10069.1-2006 Measurement of Airborne Noise Emitted by Rotating Electrical Machines and the Noise Limits - Part 1: Method for the Measurement of Airborne Noise Emitted by Rotating Electrical Machines
GB/T 21211-2007 Rotating Electrical Machines - Equivalent Loading and Super-position Techniques - Indirect Testing to Determine Temperature Rise
GB/T 22715-2008 Impulse Voltage Withstand Levels of Form-wound Stator Coils for Rotating a.c. Machines
GB/T 22719.1-2008 Interturn Insulation of Random-wound Winding for AC Low-voltage Electrical Machines - Part 1: Test Methods
GB/T 22719.2-2008 Interturn Insulation of Random-wound Winding for AC Low-voltage Electrical Machines - Part 2: Test Limits
JB/T 7836.1-2005 Electric Heater for Electrical Machine - Part 1: General Technique Specifications
JB/T 10500.1-2005 Embedded Thermometer Resistance for Electrical Machines - Part1: General Specification, Measuring Methods and Examine Rule
IEC 60034-2-1:2007 Methods for Determining Losses and Efficiency of Rotating Electrical Machinery from Tests (Excluding Machines for Traction Vehicles)

3 Main Symbols

cosφ——the power factor

f——the supply frequency, Hz

I1——the stator line current, A

I0——the no-load line current, A

IK——the locked-rotor line current, A

IN——the rated current, A

K1——the reciprocal of the resistance temperature coefficient for conductor material of stator winding at 0℃

For copper, K1=235;

For aluminum, K1=225, unless otherwise specified;

If other materials are used, K1 will be separately specified.

K2——the reciprocal of the resistance temperature coefficient for conductor material of rotor winding at 0℃

For copper, K2=235;

For aluminium, K2=225, unless otherwise specified;

If other materials are used, K2 will be separately specified.

J——the moment of inertia, kg•m2

n——the rotational speed measured during test, r/min

ns——the synchronous speed, r/min

p——the number of pole pairs

P1——the input power, W

P2——the output power, W

PN——the rated (output) power, W

Foreword III
1 Scope
2 Normative References
3 Main Symbols
4 Test Requirements
4.1 General
4.2 Test Power Supply
4.3 Test Instruments and Measurement Requirements
5 Test Preparation
5.1 Determination of Insulation Resistance
5.2 Determination of DC Terminal Resistance and Phase Resistance of Winding under Actual Cold State
6 Thermal Test
6.1 Purpose
6.2 General Description
6.3 Determination of Coolant Temperature during Thermal Test
6.4 Determination of Coolant Temperature at the End of Test
6.5 Temperature Measurement of Winding and Other Parts of Motor
6.6 Thermal Test Methods
6.7 Temperature Rise
6.8 Determination of working temperature of winding, θw, at rated load
6.9 Determination of the specified temperature θs for efficiency calculation
7 Load Characteristic Test
7.1 General
7.2 Load Test
7.3 Determination of the Corrected Value of Torque Reading Tc
7.4 Shaft Torque
7.5 Shaft Power
8 No-load Test
8.1 Determination of No-load Current and No-load Loss
8.2 Determination of friction and windage losses Pfw
8.3 Determination of iron loss PFe
9 Determination of Locked-rotor Current and Locked-rotor Torque
9.1 Locked-rotor Test at Rated Frequency
9.2 Low Frequency Locked-rotor Test
10 Determination Methods of All the Losses
10.1 General
10.2 Determination of the I2R Loss of Stator at Test Temperature
10.3 Determination of the I2R Loss of Stator Winding at Test Temperature
10.4 Determination of Friction and Windage Losses Pfw
10.5 Determination of Iron Loss PFe
10.6 Determination of Stray-load Loss Ps
10.7 Determination of Total Losses and Output Power
11 Determination of Efficiency
11.1 General
11.2 Method A —— the Input - Output Method
11.3 Method B——the Loss Analysis Method for Measuring Input Power and Output Power
11.4 Method C——Loss Analysis Methods of Dual Supply Back-to-back Test for Motors in Pair
11.5 Method E or Method E1——the Loss Analysis Method for Measuring Input Power
11.6 Method F or F1——Equivalent Circuit Method
11.7 Method G or G1——Reduced Voltage Load Method
11.8 Method H——Circle Diagram Method
12 Other Test Items
12.1 Determination of Maximum Torque
12.2 Determination of Minimum Torque
12.3 Determination of Rotational Inertia
12.4 Short-time Over Torque Test
12.5 Interturn Impulse Withstand Voltage Test
12.6 Power Frequency Withstand Voltage Test
12.7 Determination of Rotor Voltage
12.8 Overspeed Test
12.9 Noise Determination
12.10 Vibration Determination
12.11 Determination of Bearing Voltage
12.12 Determination of Bearing Current
Annex A (Normative) Correction Methods for Instrument Loss and Error
Annex B (Normative)
Calculation of Values for Eh-star Method (No-load Test of Winding in Star Connection on Unbalanced Voltage)
Annex C (Informative) Linear Regression Analysis
References

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend