GB/T 23755-2020 in English
VALIDThree-phase site-combined power transformer
- Issued on:2020-11-19
- Implemented on:2021-06-01
- File Format:PDF
- Delivery:Via email within 5 business days
$301.00
《GB/T 23755-2020三相组合式电力变压器》由TC44(全国变压器标准化技术委员会)归口,主管部门为中国电器工业协会。
Introduction
Standard Evolution and Technological Breakthroughs
| Version | Core Improvements | Energy Efficiency Improvements | New Contents |
|---|---|---|---|
| 2009 Edition | Basic Specifications | — | 110-500kV Basic Parameters |
| 2020 Edition | Average Losses Reduced by 20% | No-load Current Reduced by 20% | 330kV Class Parameters/40-50MVA Capacity Expansion |
Core Parameters Comparative Analysis
Typical Product Performance Comparison
| Capacity Range (kVA) | Voltage Level (kV) | No-load Loss (kW) | Load Loss (kW) | Short-circuit Impedance (%) |
|---|---|---|---|---|
| 40,000-180,000 | 110 | 33-100 | 148-460 | 12-14 |
| 90,000-720,000 | 330 | 75-366 | 274-1347 | 14-16 |
| 360,000-860,000 | 500 | 200-430 | 882-1750 | 16±1 |
Special structural requirements
The three-phase combined transformer adopts a split-phase unit design. Each unit contains an independent magnetic circuit and oil tank.>interphase pipelines to achieve electrical connection. Key features include:
- Modular transportation: Maximum single piece transportation weight ≤400 tons (500kV level)
- Cooling system: Optional centralized or distributed cooling solutions
- Voltage regulation method: Three-phase synchronous voltage regulation system error ≤1.25%
Adaptability to plateau environment
| Altitude (m) | Air pressure (kPa) | Temperature rise correction factor | Insulation correction requirements |
|---|---|---|---|
| ≤1000 | 101.3 | 1.00 | — |
| 3000 | 70.1 | 1.15 | External insulation distance +12% |
| 5000 | 54.0 | 1.30 | Special bushing sealing design |
Implementation suggestions
Selection guide
- Preferably use the off-excitation voltage regulation structure (tap changer failure rate reduced by 60%)
- For 500kV level, it is recommended to use the YNd11 connection group
- When the capacity is ≥240MVA, a three-winding autocoupler structure is recommended
Installation points
- Foundation settlement control: differential settlement ≤3mm/10m
- Interphase pipeline sealing test: 0.25MPa/30min without leakage
- Transport impact monitoring: three-dimensional acceleration ≤3g

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

GB/Z 1094.20-2026 in English
Power transformers—Part 20:Energy efficiency
2026-07-02 -

GB/T 1094.7-2024 in English
Power transformers—Part 7: Loading guide for mineral-oil-immersed power transformers
2024-11-28 -

GB/T 10228-2023 in English
Technical parameters and requirements for dry-type power transformers
2023-05-23 -

GB/T 6451-2023 in English
Technical parameters and requirements for oil-immersed power transformers
2023-09-07 -

GB 19212.10-2014 in English
Safety of transformers,reactors,power supply units and combinations thereof-Part 10: Particular requirements and tests for transformers and power supply units for class Ⅲ handlamps for tungsten filament lamps
2014-12-05 -

GB/T 17468-2019 in English
Guide for choice power transformers
2019-12-10 -

GB/T 18494.1-2014 in English
Converter transformers―Part 1:Transformers for industrial applications
2014-09-03 -

GB/T 41135.1-2021 in English
Current and voltage sensors or detectors,to be used for fault passage indication purposes―Part 1:General principles and requirements
2021-12-31 -

GB/T 31462-2015 in English
Main body technical specification for 500 kV and 750 kV multistage controlled shunt reactors
2015-05-15 -

GB/Z 34935-2017 in English
Technical specification for oil-immersed smart power transformers
2017-11-01