Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
equipment management basic information management requirements specification personnel core requirements core modules gb/t27025 requirements third-party coal white bottom coated white cardboard cold bending forming steel band
GB/T 40697-2021 in English

GB/T 40697-2021 in English

VALID

Specification for management of the third-party coal testing

  • Issued on:2021-10-11
  • Implemented on:2022-05-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00

《GB/T 40697-2021第三方煤炭检测管理规范》由TC42(全国煤炭标准化技术委员会)归口,TC42SC1(全国煤炭标准化技术委员会煤炭检测分会)执行,主管部门为中国煤炭工业协会。


Introduction

Standard framework and core requirements

Core modules GB/T27025 requirements Special provisions of this specification
Personnel qualifications General ability requirements Must hold a professional operation certificate, and sampling and preparation personnel must sign a labor contract for more than 3 years
Equipment management Basic metrological traceability Mechanized sampling and preparation equipment must pass the GB/T19494.3 bias verification, and total sulfur/calorific value projects should be equipped with two sets of equipment
Quality control Conventional monitoring requirements Annual comparison frequency ≥ 2 times, capability verification ≥ 1 time/year, mandatory use of quality control charts

Analysis of key technical points

1. Verification of mechanized sampling and preparation system

Article 6.3 of the specification clearly requires: Mobile coal flow sampling equipment must pass the three verifications of precision, bias and total moisture loss specified in GB/T19494.3. Notes during implementation:

  • Bias test sample size: should include at least 10 coal samples with different matrix characteristics
  • Total moisture loss control: the moisture loss rate of the whole system should be ≤0.5% (anthracite) or ≤1.0% (lignite)

2. Measurement uncertainty assessment

According to Article 7.6 and the requirements of GB/T33303, the uncertainty assessment of coal detection should focus on:

Case: Sources of uncertainty in calorific value determination
  1. Sampling variance (contribution rate of about 60-70%)
  2. Sample preparation variance (contribution rate of 15-20%)
  3. Oxygen bomb calorimeter calibration error (contribution rate of 5-8%)

Implementation Suggestions

1. Multi-laboratory collaboration mechanism

In response to Article 7.3.2 on equipment rental, it is recommended to establish:

  • Equipment sharing whitelist: Laboratories certified by CNAS can establish an equipment mutual recognition mechanism
  • Process traceability system: Use blockchain technology to record the use log of sampling equipment

2. Construction of intelligent quality control system

In response to Article 7.11 on information management requirements, it is recommended to deploy:

  • LIMS system integration automatic sampler data interface
  • AI video analysis to monitor the compliance of the entire sample preparation process

Sample only — not a preview of GB/T 40697-2021
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend