Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
minimum turning clearance circle minimum turning circle diameter circle diameter minimum clearance circle diameter maximum turning clearance circle width radio wave propagation ybgb2-w series pipeline pumps iron-free performance scopethis part
GB/T 12540-2009 in English

GB/T 12540-2009 in English

SUPERSEDED

Minimum turning circle diameter minimum turning clearance circle diameter and out value test method for motor vehicles

  • Issued on:2009-03-23
  • Implemented on:2010-01-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $40.00
$39.00
Standard No: GB/T 12540-2009
Document status: SUPERSEDED
Superseded by: GB/T 12540-2024 Minimum turning circle diameter, turning clearance circle and swing-out value test method for motor vehicles and combination of vehicles
Superseded on: 2025-04-01
Title in English: Minimum turning circle diameter minimum turning clearance circle diameter and out value test method for motor vehicles
Title in Chinese: 汽车最小转弯直径、最小转弯通道圆直径和外摆值测量方法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2009-03-23
Implemented on: 2010-01-01
Superseding: GB/T 12540-1990 Motor vehicles-Minimum turning diameter-Method of measurment
ICS Classification: 43.020-Road vehicles in general
Chinese Classification: T04-Basic standards and general methods
Professional Classification: GB-National Standard
Related Keywords: minimum turning clearance circle
minimum turning circle diameter
circle diameter minimum
clearance circle diameter
maximum turning clearance circle width
Related Topics: Exosome diameter
Exosome diameter
Exosomes + Diameter
bend
Best way to measure pore size
Exosome diameter
change
Exosome diameter
Exosomes, diameter
Maximum amount of transfection
gb/t12540
flash cuvette
UV minimum concentration
bend bend
value measurement
What is the smallest r square
How to measure diameter
Spot diameter measurement method
Best way to measure pore size
Small Aperture Measurement Method
root diameter method
How to use the diameter
Diameter measuring system
Minimum object field
GB/T12540
GBT12540
GBT 12540
GBT12540-1990
GB/T 12540-2009
GB/T 12540-2009
Minimum weighing value of balance
Minimum weight
Diameter measurement specifications
Road deflection value calculation method
The best way to straighten a straightener
Pipeline through train
Minimum weighing value calculation method
How to measure roundness value
How to measure the inner diameter of a circle
Inner diameter measurement

《GB/T 12540-2009汽车最小转弯直径、最小转弯通道圆直径和外摆值测量方法》由TC114(全国汽车标准化技术委员会)归口,TC114SC19(全国汽车标准化技术委员会整车分会)执行,主管部门为工业和信息化部。
本标准规定了汽车最小转弯直径、最小转弯通道圆直径和外摆值的测量方法。
本标准适用于汽车及汽车列车。


1 Scope

This standard specifies the measuring method of minimum turning circle diameter, minimum turning clearance circle diameter and out value for automobile.
This standard is applicable to the automobile and the truck combination.

2 Terms and Definitions

The following terms and definitions are applicable to this standard.
2.1 Turning circle diameters d1
The diameter of trajectory circle, with the center (for a double-tire, it's the center of the double-tire) of each wheel's tire surface (inside and outside) on flat ground where the handwheel goes to the limit position (see Figure 1).
2.2 Minimum turning circle diameter d
Where the handwheel goes to the limit position, the center of the outside vehicle guide wheel tire surface go round on the flat ground, and the bigger diameter of the trajectory circle is the minimum turning circle diameter.
2.3 Turning clearance circle
Where the vehicle is turning a corner, the following two circles are the vehicle turning clearance circles (see Figure 2).
a) The projection of all the parts of the vehicle(except the rearview mirror, lower vision mirror and antenna, the same below ) on the flat ground is located in the minimum encircle inside the circles - encircle of the turning clearance circle (diameter D1) .
b) The projection of all the parts of the vehicle on the flat ground is located in the max inner circle outside the circles - inner circle of the turning clearance circle (diameter D2).
2.4 Turning clearance circle width b
The turning clearance circle width B is one half of the difference between excircle of the turning clearance circle (diameter D 1) and inner circle of the turning clearance circle ( diameter D2), namely B = ( D 1 - D 2)/2.
2.5 Minimum turning clearance circle
The minimum turning clearance circle is the turning clearance circle where the handwheel goes to the limit position.
2.6 Maximum turning clearance circle width
The maximum turning clearance circle width is the turning passage width where the handwheel go to the limit position.
2.7 Out value T
Where automobile or truck combination is parked in straight line traveling state on the flat ground, draw a projection line paralleling with the vertical center line of the vehicle on the ground along the outermost lateral point of the vehicle; then they start and transfer from straight line traveling to circle traveling on the 25m diameter of the turning clearance circle excircle(except the rearview mirror ,lower vision mirror and antenna ,count from the outermost lateral part without taking into account the projecting part of the operation - functional isolated plant until the tail enter into this circle entirely ;in this process, the projection of any outer lateral part of the vehicle form a group of outer pendulum trajectory, and the distance between these group trajectory and the projection line of the outermost lateral part of the vehicle on the ground where the vehicle are at a standstill is the out value test (see Figure 3) .

1 Scope
2 Terms and Definitions
3 Test Conditions
4 Testing Methods
5 Results and Testing Records

Sample only — not a preview of GB/T 12540-2009
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend