Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

Workover

Workover, Total:98 items.

The international standard classification for "Workover" includes: Exploratory and extraction equipment , Equipment for petroleum and natural gas industries in general , Equipment for petroleum and natural gas industries , Extraction and processing of petroleum and natural gas , Occupational safety. Industrial hygiene .

The Chinese standard classification for "Workover" includes: Petroleum drilling & production equipment and instrument , Petroleum extraction , Hygiene, safety and labor protection .


Professional Standard - Petroleum

  • SY/T 6072-2009 Milling tools for drilling and servicing
  • SY/T 6228-1996 Recommended practices for occupational safety for oil and gas well drilling and servicing operations
  • SY/T 5080-2004 Rotary table for petroleum drilling and workover rig
  • SY/T 5791-1993 Process of casing reformation and strengthening seal
  • SY/T 5587.7-1993 Oil and water well routine workover operation well cleaning operation rules
  • SY/T 5587.3-2013 Codes for Conventional Workover Job - Part 3: Killing Well, Displaced Flow and Induced Flow
  • SY/T 5587.14-1993 Oil and water well routine workover operation cement plug operation rules
  • SY/T 6117-1994 The operating and maintenance of petroleum workover rig
  • SY/T 5587.3-1993 Oil and water well conventional workover operation operation rules for killing well and replacing blowout
  • SY/T 5587.5-2004 Codes for conventional workover job -- Part 5: Preparation of well bore for downhole operation
  • SY/T 6756-2009 Specification for workover in hydrocarbon reservoir underground gas storage
  • SY/T 6408-2004 Recommended practice for use and procedures for inspections maintenance and repair of drilling and well servicing structures
  • SY/T 5587.20-1994 Technical Practice of Fishing Rod Drops in Conventional Workover Operation of Oil and Water Wells
  • SY/T 5068-2000 Overshot for drilling and servicing
  • SY/T 5587.10-2012 Code for conventional workover job—Part10:Hydroblasting perforation
  • SY/T 5069-2000 Spear for drilling and servicing
  • SY/T 6113-1994 Specifications for Pneumatic Chucks for Well Workover
  • SY/T 6113-2016 Pneumatic spider for well servicing
  • SY/T 6113-2008 Pneumatic spider for well servicing
  • SY/T 5097-2006 Technical specifications of multi-parameter monitoring instrument of drilling/servicing rig
  • SY 6442-2010 Specification for grading appraisal of petroleum drilling rig and workover rig derricks
  • SY/T 5587.19-1994 Technical practice of salvage pipes and falling objects in conventional workover operations of oil and water wells
  • SY/T 6680-2021 Petroleum drilling and production equipment. Acceptance specification for petroleum drilling and workover rigs
  • SY/T 5074-2004 Power tongs for petroleum drilling and well servicing
  • SY/T 6605-2004 Safe technical inspection code of hoist specially used in petrolic drilling & well reconditioning industry
  • SY/T 6680-2013 Acceptance Specification for Petroleum Drilling and Serviciing Rigs
  • SY/T 5587.12-1993 Oil pump salvage operation method for routine workover of oil and water wells
  • SY/T 5572-2012 Fishing Tool Classification and Technical Regulations for Drilling and Servicing
  • SY/T 5202-2004 Petroleum workover rig
  • SY/T 5587.9-2021 Codes for conventional workover. Part 9: Operating procedure for wellhead replacing
  • SY/T 5080-1992 Workover rotary table
  • SY/T 6326-2008 The method of measuring and evaluating of the loading capacity on rig derricks
  • SY/T 5587.12-2004 Codes for conventional workover job -- Part 12: Fishing
  • SY/T 5246-1991 General technical specifications for workover and fishing tools
  • SY/T 6228-2010 Recommend Practic for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations
  • SY/T 5587.9-1993 Operating rules for oil and water well routine workover operations to replace wellhead devices
  • SY/T 5049-2016 Drilling and workover slips
  • SY/T 5471-1992 Technical conditions of workover rig
  • SY/T 5025-1999 for drilling and well servicing structures
  • SY/T 6117-2010 The operating and maintenance of petroleum workover rig
  • SY/T 5400.2-2000 Power tongs for petroleum drilling and servicing.Part 2:Casing tongs
  • SY/T 5208-2000 Main hoisting equipment for petroleum workover
  • SY/T 5587.13-1993 Oil and water well conventional workover operation method of downhole small pieces of falling objects salvage operation
  • SY/T 5587.4-1993 Oil and water well routine workover operation oil layer casing packer leak detection operation rules
  • SY/T 5587.4-2004 Codes for conventional workover job -- Part 4: Finding and sealing of casing leak for cased wells
  • SY/T 5587.17-1993 Operating rules for fishing ropes and falling objects in conventional workover operations of oil and water wells
  • SY/T 5530-2013 Swivel for Petroleum Drilling and Workover Rigs
  • SY/T 6803-2010 Workover Rig on Offshore Petroleum Platform
  • SY/T 5532-2016 Drawworks for drilling rig
  • SY/T 6408-2018 Petroleum drilling and production equipment. Operation, inspection, maintenance, and repair of drilling and well servicing structures
  • SY/T 5587.5-1993 Oil and water well conventional workover operation oil and water well sand detection surface, sand washing operation rules
  • SY/T 5791-2007 The operating procedures for lifting and laying down of hydraulic workover rigs mast
  • SY/T 5587.3-2004 Codes for conventional workover job -- Part 3: Killing well displaced flow and induced flow
  • SY/T 6117-2003 The operating and maintenance of petroleum workover rig
  • SY/T 5587.15-1993 Drilling cement plug operation rules for routine workover operations of oil and water wells
  • SY/T 7332-2016 Elevator for drilling and well-servicing
  • SY/T 5610-1995 Oil workover rig types and basic parameters
  • SY/T 6117-2016 The operating and maintenance of petroleum drilling rig and workover rig
  • SY/T 5587.10-1993 Hydraulic sandblasting and perforating operation rules for routine workover of oil and water wells
  • SY/T 5587.14-2004 Codes for conventional workover job -- Part 14: Cementing plug and drilling out
  • SY/T 6918-2012 Petroleum and Natural Gas Industries--Drilling and Well Servicing Equipment--Mud-pump
  • SY/T 5470-2002 Drawworks for petroleum workover
  • SY/T 6724-2008 Basic Configuration for Drilling and Well Servicing Rigs
  • SY/T 5530-2005 Swivel for petroleum drilling and workover rigs
  • SY/T 5070-2012 Cutters for drilling and servicing
  • SY/T 5080-2013 Rotary Table for Petroleum Drilling and Workover Rig
  • SY/T 6803-2016 Marine workover rig
  • SY/T 6408-1999 Maintenace and use of drilling and well servicing structures
  • SY/T 6680-2007 Acceptance specification for petroleum drilling and servicing rigs
  • SY/T 5097-1996 Technical conditions of multi-parameter instrument for drilling (workover) well
  • SY/T 7295-2016 Recommended practices for environmental protection in onshore oil and gas well workover operations
  • SY/T 6408-2012 Recommended practice for use and procedures for inspections,maintenance and repair of drilling and well servicing structures
  • SY 6605-2011 Safe Technical Inspection Code of Hoist Specially Used in Petrolic Drilling and Well Reconditioning
  • SY/T 5587.11-1993 Drilling and milling process of drillable packer in routine workover of oil and water wells
  • SY/T 5400.1-2000 Power tongs for petroleum drilling and servicing.Part 1:Drill tongs
  • SY/T 5202-1991 Technical conditions of petroleum workover rig
  • SY/T 5587.18-1993 Drilling and milling operation rules for drillable bridge plugs in routine workover operations of oil and water wells
  • SY/T 6911-2012 Petroleum drilling/workover electronic weight indicator system
  • SY/T 5587.11-2004 Codes for conventional workover job -- Part 11: Milling operation of packer and bridge plug
  • SY/T 5587.8-1993 Operating procedures for finding, sealing and inspecting strings in routine workover operations of oil and water wells
  • SY/T 5587.6-1993 Oil and water well routine workover operation operation rules for lifting and lowering tubing
  • SY 5070-2012 Cutters for drilling and workover
  • SY/T 5587.16-1993 Oil and water well routine workover operation well drilling and casing scraping operation rules
  • SY/T 5070-2002 Cutters for drilling and servicing
  • SY/T 5587.9-2007 Codes for conventional workover job-Part 9: Procedure of wellhead for replacing opertating
  • SY/T 6958-2013 Petroleum Drilling and Workover Rigs for Low Temperature Conditions
  • SY/T 5069-2009 Spear for drilling and servicing
  • SY/T 5285-1991 Milling and grinding shoes for well workover

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB/T 25428-2010 Petroleum and natural gas industries—Drilling and production equipment—Drilling and well-servicing structures
  • GB/T 23505-2009 Petroleum drilling and workover rigs
  • GB/T 17744-2008 Petroleum and natural gas industries - Drilling and well servicing equipment
  • GB/T 25428-2015 Petroleum and natural gas industries―Drilling and production equipment―Drilling and well-servicing structures
  • GB/T 32338-2015 Petroleum and natural gas industries - Drilling and well servicing equipment - Mud-pump

Henan Provincial Standard of the People's Republic of China

  • DB41/T 2500-2023 Technical specifications for groundwater monitoring well cleaning and workover

国家市场监督管理总局、中国国家标准化管理委员会

  • GB/T 17744-2020 Petroleum and natural gas industries—Drilling and well servicing equipment

能源部

中华人民共和国国家质量监督检验检疫总局、中国国家标准化管理委员会

  • GB/T 35146-2017 Petroleum and natural gas industries-Offshore drilling and workover equipment