Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

well

well, Total:200 items.

The international standard classification for "well" includes: Exploratory and extraction equipment , Extraction and processing of petroleum and natural gas , Mining and quarrying , Equipment for petroleum and natural gas industries in general , Occupational safety. Industrial hygiene , Equipment for petroleum and natural gas industries , Other equipment for petroleum and natural gas industries , Coals , Drainage systems .

The Chinese standard classification for "well" includes: Petroleum exploration logging equipment and instrument , Petroleum drilling , Petroleum extraction , Petroleum geology exploration , Petroleum development , Petroleum drilling & production equipment and instrument , Hygiene, safety and labor protection , Basic standard and general method , Petroleum exploration, development, gathering and transportation engineering in general , Computer application , Nontechnical ore survey , Mining , Solid fuel ore in general , Building water supply and draining engineering , Mine and coal engineering .


Professional Standard - Petroleum

  • SY/T 5587.6-1993 Oil and water well routine workover operation operation rules for lifting and lowering tubing
  • SY/T 6396-1999 Requirements for cluster drilling hole anticollision technology
  • SY/T 6963-2013 Guildlines for Drilling Program of Extended Reach Well
  • SY/T 7084-2016 Cement head and common cementing plug
  • SY/T 5440-2000 Technical specifications for natural gas well test
  • SY/T 5088-2008 Specification for wellbore quality
  • SY/T 6489-2020 Specification for horizontal well logging data processing and interpretation
  • SY/T 5977-1994 Interpretation specification for logging data of comprehensive mud logging tool
  • SY/T 7028-2022 The safety rules of height escaping system for drilling or workover rigs
  • SY/T 5073-2008 Logging cable trucks
  • SY/T 5792-1993 Technic demands on whisper operation and well completion
  • SY/T 5599-1997 Drawing standard for the end-well geological graph of the oil & gas exploration well
  • SY/T 5734-1995 Test Specification for Examining Seal of Under-well Packer for Separate Mining and Separate Injection Well
  • SY/T 5025-1999 for drilling and well servicing structures
  • SY/T 5587.16-1993 Oil and water well routine workover operation well drilling and casing scraping operation rules
  • SY/T 5955-2004 Trajectory quality for directional well
  • SY/T 6464-2000 Technical requirements for horizontal completion technologh
  • SY/T 6939-2013 Specification for Processing, Interpretation & Evaluation of Multi-well Logging Data
  • SY/T 6426-2005 Specification for well control technology of drilling
  • SY/T 5087-2005 Recommended practice for safe drilling operations involving hydrogen sulfide
  • SY/T 5080-1992 Workover rotary table
  • SY/T 5338-2011 Practice for Sand Control Technology of Strength and Artificial Borehole Well
  • SY/T 6120-1995 Oil well downhole operation blowout prevention technical regulations
  • SY/T 6031-2006 The calibration for thermometer caliper and inclinemeter
  • SY/T 6438-2000 Mudlogging data quality control procedure of hydrocarbon exploratoroy well
  • SY/T 6030-2003 Specification for logging operation of horizontal wells
  • SY/T 6127-2006 Specifications of data collection items for downhole operation in oil gas and water well
  • SY 6442-2010 Specification for grading appraisal of petroleum drilling rig and workover rig derricks
  • SY/T 6203-1996 Emergency measures for oil and gas well blowout and fire
  • SY/T 6464-2010 Technical Requirements for Horizontal Well Completion Technology
  • SY/T 6846-2012 Horizontal well completion technology with stage cementing
  • SY/T 6410-1999 Calibration for logging tool on production well profile
  • SY/T 5788.3-2008 geological logging regulations for oil and gas exploration wells
  • SY/T 6243-1996 The engineering logging specification of hydrorcarbon exploratory well
  • SY/T 6031-1994 Maintenance and Calibration Technical Regulations for Well Temperature Logging Instrument
  • SY/T 6426-1999 Specification for well control technology of driling
  • SY/T 5599-2006 Compiling Specification for the Geological Summary Report of Geologging of the Oil and Gas Exploration Wells
  • SY/T 5172-2007 Specifications for trajectory control in straight holes
  • SY/T 5374.2-2006 Cementing specifications Part 2:Special cementing
  • SY/T 5967-1994 Installation, commissioning and maintenance of drilling well control devices
  • SY 5974-2014 Code for safety technology of drilling wellsite, equipment and operation
  • SY/T 5788.3-2014 Specifications for geological logging of oil and gas wells
  • SY/T 5792-2003 Technical demands on whisper operation and well completion
  • SY/T 5394-2004 Cement head and cementing plug
  • SY/T 5089.2-2007 Well history format for drilling Part 2:Offshore drilling
  • SY/T 5373-2009 Diagram and symbol for down hole drilling tools and operation
  • SY/T 6241-1996 Principles and Requirements for Well Site Layout of Cluster Wells
  • SY/T 5729-2012 Operation specifications for thermal recovery well of heavy oil and well cementation
  • SY/T 6203-2007 Wrecking method for oil and gas well blowout and fires
  • SY/T 5465-2000 Operating procedure for production profile logging in production well
  • SY/T 6228-2010 Recommend Practic for Occupational Safety for Oil and Gas Well Drilling and Servicing Operations
  • SY/T 5678-2003 The rules for checking and accepting completed well
  • SY 5974-2007 Specificaton for well technology safety of wellsite、equipment、task
  • SY/T 5880.4-1995 Petroleum Logging Tool Calibration - Acoustic Velocity Logger
  • SY/T 7490-2020 Operational procedures of parallel horizontal well drilling
  • SY/T 5089.1-2007 Well history format for drilling Part 1:Onshore drilling
  • SY/T 6822-2011 Optimization of open hole logging suite
  • SY/T 5587.3-2013 Codes for Conventional Workover Job - Part 3: Killing Well, Displaced Flow and Induced Flow
  • SY/T 5952-2014 Legends of downhole strings and tools for production and injection well
  • SY/T 5852-1993 Offshore Gas Well Completion Testing Technical Specifications
  • SY/T 5869-1993 Routine test of downhole pressure of self-flowing well
  • SY/T 5247-2008 Recommended handling methods of downhole problems in driling
  • SY/T 5079-1999 Well testing truck
  • SY/T 6030-1994 Specification for logging operation of horizontal wells
  • SY/T 5374.1-2016 Cementing specification. Part 1: Conventional primary well cementing
  • SY/T 5089.2-2013 Final Drilling Report Format - Part 2: Offshore Drilling
  • SY/T 5678-1993 The rules for checking and accepting completed well
  • SY/T 6333-1997 Horizontal drilling technology and its quality control requirements
  • SY/T 5587.3-1993 Oil and water well conventional workover operation operation rules for killing well and replacing blowout
  • SY/T 5962-2014 Well cleanout equipment
  • SY/T 6831-2011 Mud logging series specification for oil & gas well
  • SY/T 7487-2020 Requirements for drilling operations of offshore high-temperature & high-pressure well
  • SY/T 5788.3-1999 geological logging regulations for oil and gas exploration wells
  • SY/T 5587.5-1993 Oil and water well conventional workover operation oil and water well sand detection surface, sand washing operation rules
  • SY/T 5600-2002 The operating regulation of open hole and cased hole logging
  • SY/T 5974-2020 Technical safety code for drilling wellsite, equipment and operation
  • SY 6442-2000 Specification for grading appraisal of drilling derricks
  • SY/T 5251-2010 Contents and Basic Quality Requirements of Mud Logging Items of Oil & Gas Wells
  • SY/T 5360-2020 The processing procedure of single well logging data in open hole
  • SY/T 6616-2005 Specifications of well-control equipments arrangement installation and operation for oil and gas well involving sulfide
  • SY/T 5089-1992 Drilling well history and shift report format
  • SY/T 5089.1-2011 Well History Format for Drlling. Part 1: Onshore Drilling
  • SY/T 5587.7-1993 Oil and water well routine workover operation well cleaning operation rules
  • SY/T 5674-1993 Method for compiling well history of prodution well and water injection well
  • SY/T 6990-2014 Techniques for the sidetracking well completion with expandable tubular
  • SY/T 6408-1999 Maintenace and use of drilling and well servicing structures
  • SY/T 6415-2010 Geological Logging Quality Qualification and Filing for Oil and Gas Exploratory Wells
  • SY/T 6540-2021 Lab testing method of drilling and completion fluid damaging oil formation
  • SY/T 6747-2008 Specifications for logging exploration wells by NMR physical property
  • SY/T 6182-2008 Calibration for logging tool on production well profile
  • SY/T 6690-2008 Specification for well control technology of downhole operation
  • SY/T 6396-2014 Slot layout and anti-collision technical requirements of platform cluster well drilling
  • SY/T 6396-2009 Requirements for wells anticollision technology
  • SY/T 6244-1996 Design regulations for well site of oil and gas exploratory well
  • SY/T 6120-2013 Specification for Blowout Prevention during Down-hole Operations in Oil Well
  • SY/T 6203-2014 Wrecking method for oil and gas well blowout and fire
  • SY/T 6127-1995 Project specification for oil, gas and water well downhole operation data collection
  • SY/T 5070-2012 Cutters for drilling and servicing
  • SY/T 6918-2012 Petroleum and Natural Gas Industries--Drilling and Well Servicing Equipment--Mud-pump
  • SY/T 5587.3-2004 Codes for conventional workover job -- Part 3: Killing well displaced flow and induced flow
  • SY/T 5791-2007 The operating procedures for lifting and laying down of hydraulic workover rigs mast
  • SY/T 5788.2-1997 Gas logging specifications for oil & gas exploration well
  • SY/T 6195-1996 Specifications for Geological Mud Logging for Completion of Oil and Gas Exploration Wells
  • SY/T 5587.13-1993 Oil and water well conventional workover operation method of downhole small pieces of falling objects salvage operation
  • SY 5727-1995 Safety requirements for electricity use in wellsites for downhole operations
  • SY/T 5374.2-2023 Cementing specification - Part 2 : Special cementing
  • SY/T 5373-2020 Diagram and symbol for down hole drilling tools and operation
  • SY/T 6408-2012 Recommended practice for use and procedures for inspections,maintenance and repair of drilling and well servicing structures
  • SY/T 7624-2021 Specifications for downhole throttling of gas well
  • SY/T 6691-2014 Specifications for design of open hole logging
  • SY/T 5087-2003 Safe drilling reommended practice for oil and gas well containing sulfide
  • SY/T 5955-1999 Directional drilling technology and its quality control requirements
  • SY/T 6228-1996 Recommended practices for occupational safety for oil and gas well drilling and servicing operations
  • SY/T 6415-2020 Oil&gas well logging data quality estimation specification
  • SY/T 5788.1-1993 Oil and gas drilling geological comprehensive logging procedures
  • SY/T 6690-2016 Specification for well-control technology of downhole operation
  • SY/T 6408-2004 Recommended practice for use and procedures for inspections maintenance and repair of drilling and well servicing structures
  • SY/T 5587.14-1993 Oil and water well routine workover operation cement plug operation rules
  • SY/T 5587.5-2004 Codes for conventional workover job -- Part 5: Preparation of well bore for downhole operation
  • SY/T 6172-1995 Oil well testing technical requirements
  • SY/T 5587.9-1993 Operating rules for oil and water well routine workover operations to replace wellhead devices
  • SY/T 5248-1991 Drilling well drop fishing method
  • SY/T 5373-1991 Graphical Symbols for Drilling Downhole Tools and Operations
  • SY/T 5254-2000 Symbol and code name for openhole logging data processing
  • SY/T 5440-2009 Technical specifications for natural gas well testing
  • SY/T 7489-2020 Drilling technical requirements for butted wells
  • SY/T 6489-2000 Specification for horizontal well log processing and interpretation
  • SY/T 5675-1997 Compiling specification for the end-well geological summary report of the oil & gas exploration well
  • SY/T 6646-2006 Well Abandonment and Inactive Well Practices
  • SY/T 6610-2014 Recommended practice for oil and gas well servicing and work over operations involving hydrogen sulfide
  • SY/T 5791-1993 Process of casing reformation and strengthening seal
  • SY/T 10012-1998 The Recommended Practice for Naming Offshored Oil & Gas Well Name
  • SY/T 5360-2004 The processing procedure of single well logging data in open hole
  • SY/T 5974-2014 Code for safety technology of drilling wellsite,equipment and operation
  • SY/T 7648-2021 Technical requirement for cementing of gas storage well
  • SY/T 5599-2012 Compiling specification for the mud logging summary report of exploration wells
  • SY/T 6451-2000 Specification for exploring well logging data processing and interpreting technology
  • SY/T 5962-1994 Well washing machine
  • SY/T 5532-2016 Drawworks for drilling rig
  • SY/T 5729-1995 Heavy Oil Thermal Recovery Well Recovery Operation Regulations
  • SY/T 6243-2009 Specifications for wellsite drilling monitoring of oil and gas exploration well
  • SY 6818-2011 Safety technique specifications for drilling engineering of coal-bed well
  • SY/T 6747-2014 Specification for NMR physical property logging of oil and gas wells
  • SY/T 5374.1-2006 Cementing specification Part 1:Conventional primary well cementing
  • SY/T 5074-2004 Power tongs for petroleum drilling and well servicing
  • SY/T 5788.2-2008 Gas logging specifications for oil & gas exploration well

Professional Standard - Water Conservancy

Henan Provincial Standard of the People's Republic of China

  • DB4102/T 047-2024 Technical regulations for sealing and backfilling of abandoned tubewells
  • DB41/T 2500-2023 Technical specifications for groundwater monitoring well cleaning and workover
  • DB41/T 2920-2025 Design Guidelines for Drilling and Completion of Large Diameter Engineering Shafts in Mines
  • DB4108/T 8-2023 Technical regulations for sealing and backfilling of vertical abandoned mines

Professional Standard - Coal

  • MT/T 5025-1999 Code for design of inelined shaft and chambers of coal mine
  • MT/T 5026-1999 Code for design of chambers around pitbottom of coal mine
  • MT/T 518-1995 General Technical Specifications for Drilling Shaft Permanent Support
  • MT/T 5027-1999 Code for design of pitbottom of coal mine

Shaanxi Provincial Standard of the People's Republic of China

  • DB61/T 1722-2023 Technical specifications for logging evaluation of continental shale gas wells
  • DB61/T 1180-2018 Technical specification for geological design of horizontal well single well drilling reservoir
  • DB61/T 1482-2021 Specifications for geological design of continental shale gas horizontal well drilling
  • DB61/T 2021-2025 Technical Specifications for the Installation of Wellhead Equipment for Medium and Deep Geothermal Heat Exchange Wells
  • DB61/T 2119-2025 Technical Specification for Downhole Heat Exchange in Long-term Shut-in Oil and Water Wells

Professional Standard - Light Industry

  • QB/T 203-2022 Specification for drilling technology of dissolving mineral salt

Jilin Provincial Standard of the People's Republic of China

General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China

  • GB/T 31033-2025 Technical requirements for well control technology of oil & gas drilling
  • GB/T 24504-2025 Method of injection/falloff well test for coalbed methane well
  • GB/T 32338-2015 Petroleum and natural gas industries - Drilling and well servicing equipment - Mud-pump
  • GB/T 17744-2008 Petroleum and natural gas industries - Drilling and well servicing equipment
  • GB/T 34229-2017 Coalbed methane well test method--Drill stem testing method
  • GB/T 23858-2009 Manhole cover
  • GB/T 24504-2009 The method of injection/falloff well test for coalbed methane well
  • GB/T 25428-2015 Petroleum and natural gas industries―Drilling and production equipment―Drilling and well-servicing structures
  • GB/T 25428-2010 Petroleum and natural gas industries—Drilling and production equipment—Drilling and well-servicing structures
  • GB/T 17744-2020 Petroleum and natural gas industries—Drilling and well servicing equipment
  • GB/T 41029-2021 Specification for offshore well abandonment operation of oil & gas drilling
  • GB/T 31033-2014 Specification for well control technology of oil & gas drilling
  • GB/T 39963-2021 Technical specification on C80~C100 concrete shaft lining applied in vertical freezing shaft
  • GB/T 25428-2025 Petroleum and Natural Gas Industry Drilling and Production Equipment Drilling and Workover Rigs, Bases

Professional Standard - Energy

  • SY/T 5734-2024 Seal inspection and testing procedures for downhole packers in separate production and injection wells
  • NB/T 10015-2014 Technical specifications for interference well test in coalbed
  • SY/T 6939-2024 Multistation Well Logging Comprehensive Evaluation Method
  • NB/T 10706-2021 Technical specification for geothermal well cementing
  • SY/T 5788-2024 Oil and Gas Well Geologic Logging Specifications
  • SY/T 6203-2024 Oil and Gas Well Blowout Fire Rescue Operations
  • NB/T 10709-2021 Code for acceptance of geothermal well drilling and completion engineering
  • NB/T 10696-2021 Design method of geothermal well bore structure
  • SY/T 6823-2024 Sleeve Well Remaining Oil Logging Evaluation Method
  • NB/T 11548-2024 Technical specification for parallel drilling and injection operation in vertical shaft
  • NB/T 10267-2019 Drilling geological design specification for geothermal wells
  • NB/T 10268-2019 Technical specification for mud logging of geothermal wells
  • NB/T 10266-2019 Specification for geothermal well drilling engineering design

Professional Standard-Safe Production

  • AQ/T 2076-2020 Safety technical specification for well control of shale gas well drilling

Ministry of Housing and Urban-Rural Development of the People's Replublic of China

  • GB 50384-2016 Code for design of coal mine shaft and chamber
  • GB 50384-2007 Code for design of coal mine shaft and chamber
  • GB 50415-2017 Code for design of incline shafts and chambers of coal mine
  • GB 51227-2017 Code for construction and acceptance of vertical shaft drilling
  • GB 50415-2007 Code for design of inclind shafts and chambers of coal mine

Professional Standard - Energy and Power Planning

  • DL/T 5407-2019 Specification for vertical shaft and inclined shaft construction of hydroelectric and hydraulic engineering
  • DL/T 5407-2009 Construction specification of inclined shaft and vertical shaft for hydropower and water resources engineering

Anhui Provincial Standard of the People's Republic of China

  • DB34/T 2973-2017 Acoustic Amplitude Variable Density Logging and Evaluation of Underground Gas Storage Wells

Professional Standard - Geology

  • DZ/T 0196.7-1997 General technical conditions for logging instrument - sonic logging instrument

Hebei Provincial Standard of the People's Republic of China

  • DB13/T 5353-2021 Environmental performance requirements of water-based drilling fluid for oil and gas wells